Difference between revisions of "Izabela Offshore Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Edison * Country: Croatia * Location: Offshore, northern part of Adriatic Sea * Production start: 2014 * Partners: * Type: Gas * Estimated Re...") |
Abarrelfull (talk | contribs) |
||
Line 24: | Line 24: | ||
* 2007 - FEED contract awarded | * 2007 - FEED contract awarded | ||
* 2014 - First gas produced | * 2014 - First gas produced | ||
+ | * 2019 - Energean acquired a stake in the field from Edison | ||
+++ Geology | +++ Geology | ||
Line 36: | Line 37: | ||
# [[Rosetti Marino Platform References]] | # [[Rosetti Marino Platform References]] | ||
# [http://killajoules.wikidot.com/blog:5303 Start of gas production on the Izabela field in the Adriatic Sea] | # [http://killajoules.wikidot.com/blog:5303 Start of gas production on the Izabela field in the Adriatic Sea] | ||
+ | # [https://abarrelfull.blogspot.com/2023/10/edison-announces-signing-of-agreement.html Edison announces the signing of the agreement with Energean Oil and Gas to sell the 100% of Edison Exploration and Production (E&P) and its subsidiaries in the hydrocarbons exploration and production business. The signing follows the approval of the transaction by the Edison Board of Directors on July 3, 2019.] |
Revision as of 11:43, 16 October 2023
Summary Information
- Operator: Edison
- Country: Croatia
- Location: Offshore, northern part of Adriatic Sea
- Production start: 2014
- Partners:
- Type: Gas
- Estimated Reserves: Total 2P reserves - 1.4 billion cm (8.5 MMboe) of gas
- Production Volume:
+++ Description
- Field development consists of two Platforms, Izabela South & Izabela North, and interconnecting sealines installed in about 40m water depth
+++ Contractors
- **Tecon:** Feed Design of the platforms and interconnecting sealines
- **Rosetti Marino:** Fabrication engineering, Procurement, Construction, On-shore Commissioning, Load-out, Sea Fastening, Transportation to Site, Hook-up, Commissioning, Assistance to Start up for North Jacket & wellhead platform, & South wellhead platform
- **Viktor Lenac:** Izabela North - Gas production platform
- **Micoperi:**
* Izabela North & Izabela South Platforms Installation * Sealines Laying: Izabela N to Ivana K (16”, 26km long) & Izabela N to Izabela S (10”+3”, 2,97km long)
- **FoundOcean:** Grouting for platforms
+++ History
- 2007 - FEED contract awarded
- 2014 - First gas produced
- 2019 - Energean acquired a stake in the field from Edison
+++ Geology
+++ Links
- Tecon Platform References
- Micoperi Offshore And Platform References
- Micoperi Offshore Pipeline References
- FoundOcean Subsea References
- Viktor Lenac Platform References
- Rosetti Marino Platform References
- Start of gas production on the Izabela field in the Adriatic Sea
- Edison announces the signing of the agreement with Energean Oil and Gas to sell the 100% of Edison Exploration and Production (E&P) and its subsidiaries in the hydrocarbons exploration and production business. The signing follows the approval of the transaction by the Edison Board of Directors on July 3, 2019.