Difference between revisions of "Inkoo FLNG Terminal"

From A Barrel Full
Jump to navigation Jump to search
Line 31: Line 31:
  
 
* 2022 - Agreement signed between Gasgrid Finland and Fortum
 
* 2022 - Agreement signed between Gasgrid Finland and Fortum
 +
* 2022 - FSRU delivered to Inkoo
  
 
=== Other Information ===
 
=== Other Information ===
Line 38: Line 39:
 
# [https://lng-news.blogspot.com/2022/06/finlands-first-floating-lng-terminal-to.html Finland’s first floating LNG terminal to be placed in Fortum’s Inkoo port]
 
# [https://lng-news.blogspot.com/2022/06/finlands-first-floating-lng-terminal-to.html Finland’s first floating LNG terminal to be placed in Fortum’s Inkoo port]
 
# [https://lng-news.blogspot.com/2022/09/gasgrid-finland-and-fortum-have.html Gasgrid Finland and Fortum have completed negotiations – LNG terminal vessel project progresses to plan]
 
# [https://lng-news.blogspot.com/2022/09/gasgrid-finland-and-fortum-have.html Gasgrid Finland and Fortum have completed negotiations – LNG terminal vessel project progresses to plan]
 +
# [https://lng-news.blogspot.com/2022/12/excelerate-energy-delivers-fsru.html Excelerate Energy Delivers FSRU Exemplar to Finland with Commissioning Cargo]
  
 
[[category:LNG]]
 
[[category:LNG]]
 
[[category:Finland]]
 
[[category:Finland]]

Revision as of 09:09, 30 December 2022

Summary Information

  • Ownership: Gasgrid
  • Website: https://gasgrid.fi/
  • Location: Inkloo, Finland
  • Capacity: 3 million tons/annum (4 BCM)
  • Status: Planned

Brief Description

  • The floating storage and regasification unit (FSRU) Exemplar is 291 meters long and 43 meters wide.
  • It has a volume of approximately 151,000 cubic meters, corresponding to approximately 68,000 tonnes of LNG, liquefied natural gas, when fully loaded.
  • This means approximately 1,050 GWh of energy content.

Technical Details

  • Storage capacity: 151,000 cubic meters
  • Unloading capacity:
  • Send out capacity: 140 GWh/day
  • Constructor:

Ongoing Projects/Project Status

  • The project is under development, and will be completed by the end of 2022

Suppliers / Customers

  • Suppliers:
  • Customers:
    • The port is well situated about 1.5 km from the Balticconnector natural gas pipeline that unites the Finnish and Baltic countries’ gas markets.

History

  • 2022 - Agreement signed between Gasgrid Finland and Fortum
  • 2022 - FSRU delivered to Inkoo

Other Information

-

Links

  1. Finland’s first floating LNG terminal to be placed in Fortum’s Inkoo port
  2. Gasgrid Finland and Fortum have completed negotiations – LNG terminal vessel project progresses to plan
  3. Excelerate Energy Delivers FSRU Exemplar to Finland with Commissioning Cargo