Ilk Insaat Platform References

From A Barrel Full
Revision as of 10:04, 22 February 2024 by Abarrelfull (talk | contribs) (Created page with " EPCC of Central Diyarbekir Oil Development ProjectEngineering, Procurement, Construction and Hook up and Commissioning of Central Diyarbekir Jacket, Drilling Platform and Top...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

EPCC of Central Diyarbekir Oil Development ProjectEngineering, Procurement, Construction and Hook up and Commissioning of Central Diyarbekir Jacket, Drilling Platform and Topside (CDDP-A) with minimum.. Petronas Carigali (Turkmenistan) Sdn. Bhd. Oil & Gas Upstream Turkmenistan Completed Projects EPCC of Garagol Deniz West Offshore Platform ProjectEPCC of 10.000 bpd oil and 35 mmscfd gas production capacity offshore fixed platform which will be located in Caspian Sea 35 m water depth. Petronas Carigali (Turkmenistan) Sdn. Bhd. Oil & Gas Upstream Turkmenistan Completed Projects EPIC of Wellhead Platform LAM-C ProjectEngineering, Procurement, Fabrication, Integration, Load Out, Piling, Offshore Installation and Commissioning of Wellhead platform. Platform consists .. Dragon Oil Ltd. Oil & Gas Upstream Turkmenistan Completed Projects Maghtumguly Collector Riser Platform ProjectProcurement, fabrication, Integration of Collector Riser Platform. Petronas Carigali (Turkmenistan)Sdn. Bhd, MMHE – Technip J.V. Oil & Gas Upstream Turkmenistan / Kiyanly / Turkmenbashi Completed Projects Maghtumguly Drilling Platform-A ProjectTemporary construction facilities, earthworks, engineering and design, fabrication, E&I, topside integration, jackets integration, pile fabrication, b.. Petronas Carigali (Turkmenistan)Sdn. Bhd, MMHE – Technip J.V. Oil & Gas Upstream Turkmenistan / Kiyanly / Turkmenbashi Completed Projects Derrick Removal at OffshoreRemoval of old derricks (6 nos) from non-operating offshore oil platforms Dragon Oil Ltd. Oil & Gas Upstream Turkmenistan Completed Projects EPIC For Three New Wellhead Towers & Associated Pipelines for Water InjectionThree New Wellhead Towers & Associated Pipelines for Water Injection Dragon Oil Ltd. Oil & Gas Upstream Turkmenistan Completed Projects EPIC of Data Acquisition and Monitoring System (DAMS) Augmentation (Phase 3) for new Field Instrumentation at LAM-A, LAM-B, LAM-C and LAM-28 PlatformsEngineering, Procurement, Installation, Testing and Commissioning support for the new field instrumentation works at DOTL\'s offshore operating facili.. Dragon Oil Ltd. Oil & Gas Upstream Turkmenistan / Hazar Completed Projects EPIC of Offshore Transportation & Installation WorksOffshore transportation installation and grouting works for West Diyarbekir and Central Diyarbekir and Garagol Deniz Drilling Platforms and relevant s.. Petronas Carigali (Turkmenistan) Sdn. Bhd. Oil & Gas Upstream Turkmenistan / Kiyanly Completed Projects EPCC of West Diyarbekir Drilling Platform ProjectEngineering, Procurement, Fabrication, Integration, Load Out and Commissioning of Drilling platform, Host tie in works in MCRA, MOPU and FSO. Water de.. Petronas Carigali (Turkmenistan) Sdn. Bhd. Oil & Gas Upstream Turkmenistan / Turkmenbashi Completed Projects EPIC of LAM-F Drilling Platform ProjectEngineering, Procurement, Fabrication, Integration, Load Out, Piling, Offshore Installation and Commissioning of Drilling platform, living quarter, he.. Dragon Oil Ltd. Oil & Gas Upstream Turkmenistan / Kiyanly / Turkmenbashi Completed Projects