Ika and Ida Gas Fields
Revision as of 11:21, 28 December 2022 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: ENI * Country: Croatia * Location: Adriatic * Production start: * Partners: ENI - 50%, INA - 50% * Type: Gas * Estimated Reserves: * Produc...")
Summary Information
- Operator: ENI
- Country: Croatia
- Location: Adriatic
- Production start:
- Partners: ENI - 50%, INA - 50%
- Type: Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- The fields initially operated with 5 unmanned platforms, IKA A, IKA B, IDA A, IDA B and IDA C
- The gas is transported to the Ivana platform
+++ Contractors
- **Saipem:** Transport & Installation of Unmanned gas platforms and sealines
- **Viktor Lenac:**
* IKA SW - Gas production platform * IKA A, IKA B, IDA A, IDA B and IDA C Gas production platforms
- **Micoperi:** IDA C monopod jacket installation
- **Rosetti Marino:** Engineering, Procurement, Fabrication, Transportation, Offshore Hook-up and Commissioning and Start-up Assistance for the IKA JZ Platform
+++ History
- 2002 - ENI signed an agreement for the development of the field
- 2004 - Ida C installed
- 2013 - Ika JZ Platform installed
+++ Geology
+++ Links
- Tecon Platform References
- Rosetti Marino Platform References
- Micoperi Offshore And Platform References
- Viktor Lenac Platform References
- FoundOcean Europe Subsea References
- Saipem Fixed Offshore Production Facilities Project References
- Saipem Europe Pipeline References
- Eni: Start Up Of The Gas Fields In The Offshore of Croatia With Reserves Of 20 Billion Cubic Meters
- Viktor Lenac» Shipyard and its Italian partner, Rosetti Marino awarded the Contract for building of five production platforms