Difference between revisions of "Ichthys FPSO"

From A Barrel Full
Jump to navigation Jump to search
Line 20: Line 20:
 
* **Alfa Laval:** Condensate preheaters
 
* **Alfa Laval:** Condensate preheaters
 
* **Process Group:**  
 
* **Process Group:**  
* Fuel Gas H2S and Mercury Removal Package
+
** Fuel Gas H2S and Mercury Removal Package
* 3 x 672 MMSCFD TEG Dehydration Packages
+
** 3 x 672 MMSCFD TEG Dehydration Packages
  
 
+++ Status
 
+++ Status
 
* Under construction
 
* Under construction
  
+++ History
+
=== History ===
 
* 2012 - Technip awarded topsides contract
 
* 2012 - Technip awarded topsides contract
 
* 2013 - Construction started  
 
* 2013 - Construction started  
Line 32: Line 32:
 
* 2014 - Keel laying ceremony held
 
* 2014 - Keel laying ceremony held
 
* 2015 - Topsides integration started
 
* 2015 - Topsides integration started
 +
* 2018 - First gas production
  
  

Revision as of 17:58, 14 November 2020

Summary Information

Brief Description

  • The FPSO is part of the [[[Ichthys LNG Terminal | Ichthys LNG Project]]]. The vessel will be used for condensate dewatering, stabilisation, storage and export
  • The vessel will be 336m by 59m and has production capacity of 100,000 barrels of gas condensate per day and 1.2 million barrels storage capacity

Contractors

  • **Daewoo Shipbuilding & Marine Engineering (DSME):** Construction of FPSO hull
  • **Technip:** Detailed engineering and procurement assistance for the topsides facilities
  • **Alfa Laval:** Condensate preheaters
  • **Process Group:**
    • Fuel Gas H2S and Mercury Removal Package
    • 3 x 672 MMSCFD TEG Dehydration Packages

+++ Status

  • Under construction

History

  • 2012 - Technip awarded topsides contract
  • 2013 - Construction started
  • 2013 - Alfa Laval awarded heater contract
  • 2014 - Keel laying ceremony held
  • 2015 - Topsides integration started
  • 2018 - First gas production


+++ Other Information

  • -

Links

  1. [[[Process Group Oil And Gas Processing References]]]
  2. Technip awarded contract for Ichthys FPSO unit
  3. Construction begins on last major offshore facility (FPSO) for Ichthys
  4. Alfa Laval wins SEK 130 million offshore gas order in South Korea
  5. Ichthys LNG Project Celebrates FPSO Keel Laying
  6. Ichthys topsides integration starts with lifts

INPEX-operated Ichthys LNG Project Commences Production