  1. Replacement Of North Breasting Kung In Energy Co., Ltd.,
    • Korea
    • Jacket : 1 Ea, Pile : 9 Ea X Od18”~ 36” Pc
    • Jul. 1976 - Oct. 1976
    • Dolphin Total : 450 M/T
  2. Yanbu Ngl Tanker Terminal
    • Saudi Arabia
    • Arabian American Oil Co., Ltd.,
    • Jacket : 15 Ea, Module : 2 Ea Pci Pile : 193 Ea X Od36” Total : 24,000 M/T
    • Jan. 1979 - Mar. 1982
  3. Yeosu Lng Tanker Terminal Honam Oil Refinery Co., Ltd.,
    • Korea
    • Jacket : 12 Ea, Pile : 55 Ea X Od36” Pcti Nov. Loading Arm : 5 Ea, Total : 4,760 M/T
    • 1979 - Dec. 1980
  4. North Rankin “A” Platform
    • Australia
    • Woodside Offshore Petroleum Pty., Ltd.,
    • Pile (24 Ea X Od53” X 154m) : 8,565 M/T PC Tubular
    • May 1980 - May 1982,
  5. Bekok “C”/ Tapis “D”
    • Malaysia
    • Esso
    • Platform, Jacket : 2 Ea Pile/Conductor : 321 Ea X Od24”~ 48”, Total : 10,780 M/T, PC
    • Jun. 1980 - Jun. 1981
  6. Champion Oil Field
    • Brunei
    • Shell
    • Development Of The Champion-7, Jacket : 6 Ea, Module : 8 Ea, Bridge : 9 Ea, Field Complex Pile : 90 Ea X Od24”~ 42”, Total : 14,227 M/T
    • Oct. 1980 - Mar. 1982
  7. F23 Gas and Condensate Field
    • Malaysia
    • Shell
    • Jacket : 3 Ea, Pile : 45 Ea X Od42”~ 54”, Total : 11,206 M/T, PCT
    • Apr. 1981 - Oct. 1982
  8. Tiong Oil and Gas Field
    • Malaysia
    • Exxon
    • Pumping Platform, Jacket : 3 Ea, Pile : 390 Ea X Od24”~ 48”, Tinggi “A” Jacket Structure Total : 14,320 M/T, PC
    • May 1981 - May 1982
  9. F23 Gas and Condensate Field
    • Malaysia
    • Shell
    • Module (3 Ea) : 3,279 M/T, PC
    • Oct. 1981 - Oct. 1982
  10. Tiong Oil and Gas Field / Kepong “A”
    • Malaysia
    • Exxon
    • Jacket : 2 Ea, Pile : 182 Ea X Od24”~ 60” PC, Facilities Total : 6,000 M/T
    • Nov. 1981 - Sep. 1982
  11. Zuluf Oil Field
    • Saudi Arabia
    • Saudi Aramco
    • Jacket : 10 Ea, Pile : 58 Ea X Od30”~ 42” Topside Module : 22 Ea, Bridge : 8 Ea, Total : 28,416 M/T, Epic
    • Dec. 1981 - Jul. 1985
  12. Iwaki Gas Field
    • Japan
    • Exxon
    • Conductor Pile (15 Ea X Od24”) : 1,200 M/T PC
    • Feb. 1982 - Apr. 1983
  13. Irong Barat Oil Field
    • Malaysia
    • Esso
    • Irong Barat “A” Jacket
    • Apr. 1982 - May 1983
  14. Semangkok Oil Field
    • Malaysia
    • Esso
    • Semankok “A” & “B” Jacket
    • Apr. 1982 - May 1983
  15. Malaysia, Esso Pulai “B” Jacket Structures Pile/Conductor : 306 Ea X Od54”~ 60” Total : 17,740 M/T
  16. Mumbai High Oil Field
    • India
    • ONGC
    • Water Injection Well Platforms - (Wi-2, 3, 4, 5) Total : 10,432 M/T
    • Platform : 4 Ea, Pile : 16 Ea
    • Epic
    • May. 1982 - Apr. 1983
  17. Mumbai High Oil Field
    • India
    • ONGC
    • Win Process Platform Facilities
    • Jacket, Topside : 5ea, Pile : 4 Ea X 48” - Total : 10,000 M/T
    • Epic
    • Jun. 1982 - Mar. 1984
  18. 16 Peninsular Malaysia Offshore Petronas Caligali Sdn., Bhd., Malaysia Jacket (4 Ea) & Pile (16 Ea) : 5,588 M/T Pc Sep. 1982 - May 1983 Gas Project
  19. Marjan Oil Field
    • Saudi Arabia
    • Saudi Aramco
    • Platform, Facilities Pile : 72 Ea X Od30”~ 48”, Bridge : 6 Ea, Total : 40,481 M/T
    • Oct. 1982 - Nov. 1985
  20. 18 Ssb Eng 83/84 Marine Platform Sarawak Shell Berhad, Malaysia Platform : 3 Ea, Pile : 12 Ea X Od30”~ 42” Pc Jan. 1983 - Dec. 1984 Total : 2,936 M/T
  21. Satun and Platong Gas Field
    • Thailand
    • Union Oil Company
    • Topside : 2 Ea, L/Q Deck : 2 Ea L/Q Building : 2 Ea, Bridge : 1 Ea Total : 8,930 M/T, EPC
    • Jul. 1983 - Jan. 1985
  22. Harvest Gas Field
    • U.S.A
    • Texaco
    • Harvest “A” Platform Topside
    • Mod (8 Ea) : 7,282 M/T Pct
    • Sep. 1983 - Jun. 1985
  23. Ssb Eng 208/82 Mini Production Sarawak Shell Berhad, Malaysia Topside (2 Ea) : 1,500 M/T Pc Oct. 1983 - Dec. 1984 Platforms
  24. Baram Delta Oil and Gas Fields
    • Malaysia
    • Sarawak Shell Berhad
    • Ssb Eng 79/83 Marine Platform
    • Siwa Jacket - Platform : 2 Ea, Pile : 7ea X Od30”~ 42” Pc
    • Total : 1,359 M/T
    • Oct. 1983 - Jun. 1984
  25. Mumbai High Oil Field
    • India
    • ONGC
    • Phase-3 Of “Sh” Complex
    • Platform : 2 Ea, Pile :12 Ea X Od60”
    • Bridge, Pipeline : 62.8 Km
    • Epic
    • Total : 17,157 M/T
    • Dec. 1983 - May 1985
  26. Mumbai High Oil Field
    • India
    • ONGC
    • Phase-2 Of “Nq” Complex
    • Jacket : 2 Ea, Pile : 12ea X Od54”
    • Topside : 3 Ea, Bridge : 3 Ea
    • Pipeline : 68.3 Km, Total : 12,248 M/T
    • Epic
    • Dec. 1983 - Apr. 1985
  27. 25 Ssb Marine Platform (Eng 79/82) Sarawak Shell Berhad, Malaysia Platform (2 Ea) : 6,631 M/T Pc Feb. 1984 - Mar. 1985
  28. East Zeit Oil Field
    • Egypt
    • Esso
    • East Zeit Platform
    • Platform & Pile : 5,873 M/T Pct
    • Apr. 1984 - Feb. 1985
  29. F6 Gas Field
    • Malaysia
    • Sarawak Shell Berhad
    • 55/83 F6-A Module
    • Topside Module : 4 Ea, Bridge : 2 Ea, Total : 7,124 M/T
    • Epic
    • Aug. 1984 - Dec. 1986
  30. F6 Gas Field
    • Malaysia
    • Sarawak Shell Berhad
    • (Eng 55/83 F6-A) Jacket & Pile
    • Jacket : 2 Ea, Pile : 8 Ea, Total : 6,756 M/T
    • Epic
    • Aug. 1984 - Jun. 1985
  31. Bassein Oil and Gas Field
    • India
    • South Bassein Platform Complex
    • Oil & Natural Gas Corporation Limited,
    • Platform (4 Ea), Pile & Bridge : 20,989 M/T
    • Epic
    • Nov. 1984 - Mar. 1987
  32. San Miguel “Julius” Platform Cities Service Oil & Gas Co., U.S.A. Jacket : 61m X 87m X 157m, Topside : 9 Ea Pct Dec. 1984 - Nov. 1986 Pile & Conductor : 9,957 M/T Total : 41,123 M/T
  33. Bouri Oil and Gas Field
    • Libya
    • ENI
    • Topside Module (9 Ea) : 10,230 M/T EPIC
    • Feb. 1985 - Jun. 1987
  34. Santa Ynez Oil Fields
    • U.S.A.
    • Exxon
    • Harmony Platform: 91.55m X 116.29m X 374.5m (H) - PC
    • Heritage Platform: 84.4m X 109.4m X 331.5m (H) - PC
    • Total : 72,100 M/T
    • Jul. 1985 - Apr. 1988
  35. Lombo East Oil Field
    • Angola
    • Texaco
    • Lombo East Development - Prospeccao Platform : 2 Ea, Pile : 32 Ea - Epic
    • Other Deck : 3 Ea, Subsea Pipeline : 105 Km
    • Total : 4,770 M/T
    • Dec. 1985 - Mar. 1987
  36. Infill Well Platform (Ia,Ib,Id & Icd) Oil & Natural Gas Corporation Limited, India Platform : 4 Ea, Pile/Conductor : 37 Ea Epic Nov. 1986 - Dec. 1987 Total : 15,000 M/T
  37. Mumbai High Oil Field
    • India
    • ONGC
    • Infill “Icp” Process Platform Complex
    • Platform & Pile, L/Q Module : 5 Ea
    • Bridge : 4 Ea, Misc. (Sbm/Plem/Buoy)
    • Pipeline (13 Lines) : 100.45 Km
    • Total : 20,913 M/T
    • Epic
    • Nov. 1986 - Feb. 1989
  38. Mumbai High Oil Field
    • India
    • ONGC
    • Infill “Icw” Process Platform Complex
    • Platform : 1 Ea, Pile : 12 Ea, Bridge : 2 Ea Epic
    • Dec. 1986 - Feb. 1989
    • Submarine P/L : 4.1 Km, Total : 11,700 M/T
  39. 37 Iraq Crude Oil Trans Saudi Arabia State Company Of Oil Project, Iraq Platform : 40 Ea, Pile : 224 Ea X Od36”~ 48” Epic Sep. 1987 - Sep. 1989 Project (Offshore Marine Terminal) Trestle Deck : 23 Ea, Bridge : 20 Ea Total : 50,754 M/T
  40. Takula Oil and Gas Field
    • Angola
    • Cabgoc
    • Takula Water Injection Platform - 5 Ea, Pile : 20 Ea X Od30”~ 36” Pct
    • Nov. 1987 - Jul. 1988
    • Total : 4,869 M/T
  41. Santa Ynez Oil Fields
    • Exxon Co.,
    • U.S.A.
    • Topside Structures - Topside Module (22 Ea) : 8,936 M/T
    • PC
    • Jan. 1988 - Jan. 1989
    • Fabrication
  42. Heera Oil Field
    • India
    • Oil & Natural Gas Corporation Limited
    • Process Platform Complex , Jacket : 3 Ea, Pile : 33 Ea, Module/Deck : 10 Ea, Bridge : 2 Ea, Misc. : 4 Ea, Pipeline (10lines, 6”~ 30”) : 20 Km, Total : 26,805 M/T,EPIC
    • May 1988 - May 1990
  43. Iwafune-Oki Oil and Gas Field
    • Japan
    • Japex Offshore
    • Iwafune-Oki Platform - Drilling / Production Module (4 Ea)
    • 5,520 M/T
    • Epct
    • Mar 1989 - May 1990
  44. Goodwyn A Gas and Condensate Field
    • Australia
    • Woodside Petroleum
    • Process Platform, Module : 4 Ea, Flare Tower : 1 Ea, Total : 10,784 M/T, PC
    • Apr. 1990 - Jun. 1992
  45. Bp Riser Jacket British Petroleum, U.K. Jacket (40m X 20m X 143m) : 6,500 M/T Pc May 1991 - May 1992
  46. Safaniya Oil Field
    • Saudi Arabia
    • Saudi Arabian Oil Company
    • Living Quarters Platform Accommodation : 140 Men, Living Quarter Module : 1,460 M/T Epct
    • Jun. 1991 - Jun. 1993
  47. Brage Oil and Gas Field
    • Norway
    • Norsk Hydro / Ake Verdal
    • Jacket Components: 11,458 M/T
    • Dec. 1991 - May 1992
  48. Jhn Julius Platform Modification Jhn Oil Operating Co., China Modification Of Platform (9 Ea) : 2,592 M/T Pct Jan. 1992 - Jul. 1992
  49. Neelam Process Complex Oil & Natural Gas Corporation Limited, India Platform : 5 Ea, Bridge : 3 Ea, Epic Feb. 1992 - Apr. 1994 Pile, Bldg./Others Pipeline (9 Lines, 1.5 ~ 36”) : 132 Km Total : 49,500 M/T
  50. Nqp Process Complex Oil & Natural Gas Corporation Limited, India Platform : 2 Ea, Pile : 13 Ea X Od48”~ 72” Epic Mar. 1992 - Apr. 1994 Module : 4 Ea, Pipeline : 8 Lines, 4”~ 30” X 102 Km Total : 14,961 M/T
  51. L-Abcd&E Well Platform Complex Oil & Natural Gas Corporation Limited, India Platform : 5 Ea, Pile : 22 Ea X Od72” Epic Mar. 1992 - May 1993 Pipeline : 6 Lines, 4”~ 6” X 66 Km Total : 18,700 M/T
  52. Yacheng 13 1 Gas Field
    • China
    • Arco
    • Wellhead Platform & Pile (Od72”~ 84”) : 6,276 M/T - CTI
    • 1993 - Apr. 1994
  53. Hibernia Oil Field
    • Canada
    • The Hibernia Management and Development Company Ltd. (HMDC)
    • Service & L/Q Module : 12,420 M/T PC
    • Mar. 1993 - Mar. 1995
  54. Harding Oil Field
    • U.K.
    • BP
    • Jack-Up Pdq Platform, Tpg-500 Triangular Leg (3 Ea) : 123m, EPC, Oil Production : 64,000 Bopd, Total : 23,300 M/T Accommodation : 84 Men
    • Mar. 1993 - Jul. 1995
  55. Edop Oil Field
    • Nigeria
    • Mobil
    • Gas Injection Platform, Jacket, Topside : 2 Ea, Pile : 8 Ea X 47” Bridge, Removal & Modification, Pipeline : 3.6 Km, Total : 6,000 M/TEpic
    • Jun. 1994 - Jun. 1996
  56. Heera Oil Field
    • India
    • Oil & Natural Gas Corporation Limited
    • Hx/Hy Wellhead Platform
    • Platform (4 Ea) : 2,900 M/T
    • Epic
    • May 1996 - Dec. 1997

Offshore Pipeline : 6”~ 12” X 39.1 Km

  1. 55 B-121/119 Wellhead Platform Oil & Natural Gas Corporation Limited, India Platform : 1,000 M/T Epic Jun. 1996 - Jan. 1997

Offshore Pipeline : 12” X 36.7 Km

  1. Pinghu Oil and Gas Field
    • China
    • China National Offshore Oil Corp. (Cnooc)
    • Offshore Platform Platform & Pile : 12,800 M/T EPIC
    • Jun. 1996 - Jul. 1998
  2. South West Ampa Gas Field
    • Brunei
    • Shell
    • Development Of Facilities For Amdp-30
    • Platform & Pile, Conductor Pipeline : 3 Km, Power Cable : 3 Km, Total : 1,670 M/T
    • Epic
    • Jul. 1996 - Jun. 1997
  3. Mumbai High Oil Field
    • India
    • ONGC
    • Booster Compressor Platform - A & B, Platform : 2 Ea, Piles, Module : 8 Ea, Living Quarter : 2 Ea, Bridge : 4 Ea,Total : 14,165 M/T, EPIC
    • May 1997 - May 1999
  4. Weizhou 12-1 Oil Field
    • China
    • China National Offshore Oil Corp.
    • Topside & Living Quarter : 5,630 M/T, Accommodation : 80 Men
    • Construction (Cnooc), Epic
    • Jul. 1997 - Mar. 1999
  5. Benchamas Oil and Gas Field
    • Thailand
    • Pogo Producing Co.
    • Platform (2 Ea) & Bridge (2 Ea) : 8,350 M/T Epic
    • Sep. 1997 - May 1999
  6. Bhn Revamp Platform - Operator : Ongc, India Living Quarter : 900 M/T Epic Oct. 1998 - Apr. 2000 Accommodation :104 Men - Contractor : Mdl
  7. South Natuna Sea Block B PSC Oil and Gas Fields
    • Indonesia
    • Conoco
    • West Natuna Block B Facilities
    • Mogpu : 23,150 M/T, Modification : 2 Ea
    • Epic
    • Feb. 1999 - May 2001
    • Subsea Tie-Back System
  8. Suizhong 36 1 Oil Field
    • China
    • China National Offshore Oil Corp.
    • Cep Topside (3 Modules) : 5,880 M/T EPIC
    • Jun. 1999 - Oct. 2000
  9. F2A Hanze Oil Field
    • Netherlands
    • Veba Oil
    • Gravity-Based Structure Platform & Deck : 21,000 M/T, Production Capacity : 30,000 Bopd, Storage Capacity : 150,000 Bbl, EPIC
    • Jul. 1999 - Jun. 2001
  10. Bongkot Gas Field Phase-3b
    • Thailand
    • Pttep
    • Wellhead Platform , Platform (2 Ea) : 3,235 M/T, Pipeline : 16”~ 18” X 23 Km, Platform Modification : 2 Ea, Epic
    • Aug. 1999 - Jun. 2001
  11. Soroosh-Nowrooz
    • Iran Epic-1
    • Shell Exploration B.V,
    • Platform : 4 Ea, Bridge & Tower Subsea Total : 4,124 M/T, P/L : 16” X 12 Km, Epic
    • Sep. 2000 - Mar. 2002
  12. Eardo Project
    • Korea
    • Korea Offshore Research
    • Platform & Pile : 3,030 M/T Epic
    • Sep. 2000 - Mar. 2003
  13. Bayu Undan Gas Field
    • Australia
    • Phillips Petroleum
    • IPD/CUQ Topsides Fabrication, (PPCO), DPP & CUP Topside : 24,300 M/T Ec
    • Oct. 2000 - Jul. 2003
  14. Lan Tay Gas and Condensate Field
    • Vietnam
    • British Petroleum
    • Production Platform : 11,000 M/T Package 1 & Package 2, Topside : 5,700 M/T, Epic
    • Dec. 2000 - Jun. 2002
  15. Donghae 1 Gas Field
    • Korea
    • Korea National Oil Corporation,
    • Platform : 10,100 M/T, Pipeline : 14” X 68 Km, Flowlines : 6” X 4 Km, Onshore Terminal, Epic
    • Mar. 2001 - Nov. 2003
  16. PM 3 CAA Oil and Gas Fields
    • Malaysia
    • Lundin Oil Company
    • Pm-3 Cpp Field Development (Phase 2) Topside
    • 7,673 M/T
    • Epic
    • Jul. 2001 - Sep. 2003
  17. Al Shaheen Oil Field
    • Qatar
    • Maersk Oil
    • Block 5 Field Development
    • Platform : 10 Ea, Gas Comp. Module : 4 Ea, Total : 37,005 M/T
    • Epic
    • Sep. 2001 - Jun. 2003
  18. Bahr Essalam Gas Field
    • Libya
    • ENI
    • Sabratha Platform: 30,832 M/T EPIC
    • Jan. 2002 - Sep. 2004
  19. Huizhou 19-3/2/1 Oil Field
    • China
    • CNOOC
    • Platform Cact-Og, Modification Of Platform : 2 Ea, 4 Legged Platform (2 Ea) : 24,000 M/T, Pipeline (2 Lines) : 18” & 14” X 41.1 Km, Subsea Cable : 31.8 Km, Epic
    • Aug. 2002 - Jun. 2004
  20. Msp Platform Oil & Natural Gas Corporation Limited, India Platform, Pile & Bridge : 13,560 M/T Epic Jun. 2003 - Apr. 2005
  21. Gauri Oil and Gas Field
    • India
    • Cairn Energy India
    • Gauri-A Pipeline Installation, Topside : 550 M/T, Pipeline :12” X 5.4 Km, Riser : 2 - IC
    • Dec. 2003 - Mar. 2004
  22. Rong Doi Gas Field
    • Vietnam
    • Korea National Oil Corporation
    • Platform (2 Ea) & Bridge Total : 17,200 M/T, Pipeline : 18” X 58 Km Epic
    • Sep. 2004 - Sep. 2006
  23. East Area Epc-1b
    • Nigeria
    • Mobil Producing Unlimited (Mpn),
    • Platform : 2 Ea, Topside : 1 Ea, Bridge : 3 Ea Total : 13,540 M/T, Epic
    • Dec. 2004 - Jul. 2007
  24. Escravos Oil and Gas Field Phase 3a (Egp3a)
    • Nigeria
    • Chevron
    • Offshore Platform (2 Ea), Jacket & Pile : 4,392 M/T Epic, F/O Installation
    • Mar. 2005 - Mar. 2007
  25. Yadana Gas Field
    • Myanmar
    • Total
    • MP Compression Platform, Pile & Bridge : 8,120 Ton EPIC
    • Oct. 2005 - Mar. 2008
  26. Umm Shaif Oil Field
    • UAE
    • ADMA-OPCO
    • Gas Injection Facilities, Platform (3ea) Pipeline : 23 km 79
    • EPIC
    • Sep. 2006 ~ Jun. 2010
    • 39,000
  27. Ofon Oil and Gas Field
    • Elf Petroleum
    • Nigeria
    • Ofon Phase 2 – OFP2 Topside - 13,400t
    • EPC
    • Jun. 2007 ~ Nov. 2014
  Limited Nigeria Topside   

North Rankin ‘B’ Gas Comp. P/F Woodside Australia Topside & DSF epC Dec. 2007 ~ Dec. 2011 23,752 Bongkot 4A P/F PTTEP Thailand Platform & Bridge (3ea) EPIC Sep. 2008 ~ Sep. 2011 29,501 SHWE Platform Daewoo International (Myanmar E&P) Myanmar Platform Pipeline : 126.5 km 83 EPIC Oct. 2009 ~ Apr. 2013 50,750 Barzan Offshore RasGas Qatar Topside (3ea) & L/Q Pipelines : 178.5 km 84 EPIC Jan. 2011 ~ Nov. 2014 8,75 5 Clair Ridge Platform BP North Sea Platform (2ea) EPC Mar. 2011 ~ Feb. 2016 43,100 DSO Platform Chevron Nigeria Platform (2ea) EPC Jan. 2011 ~ Aug. 2014 14,881 Booster Compression Platform Carigali-Hess Malaysia Platform EPC Sep. 2012 ~ Sep. 2015 24,237 Hebron Topside DES (Derrick Equipment Set) Worley Parsons (ExxonMobil) Canada DES : 25 m x 20 m x 80 m epC Feb. 2013 ~ Feb. 2015 3,200 Su Tu Nau (T&I) PTSC M&C (CLJOC) Vietnam Jacket Installation T & I Jul. 2013 ~ Oct. 2013 5,938 Bergading CPP & WHP Hess E&P Malaysia Platform (2ea) & Bridge EPIC May. 2014 ~ Nov. 2016 32,536 NASR Full Field Development – PKG2 ADMA-OPCO UAE Platform (3ea) & Bridge (11ea) EPIC Jul. 2014 ~ May. 2019 63,064 Badamyar Development Project Total Myanmar Platform (2ea) & Bridge & Pile EPC Sep. 2014 ~ Apr. 2017 13,913 Baronia CPP-B P/F Petronas Carigali Malaysia Platform EPIC Nov. 2014 ~ Nov. 2017 22,749