  • Offshore & Engineering Division has successfully completed more than 170 projects including over 100 EPIC projects in turn-key basis and has been recognized as one of the most experienced and advanced offshore yards in the world. The range of products and services covers FPSOs, FLNGs, FPUs, semisubmersibles, jack-ups, TLPs, fixed platforms, subsea pipelines, and land-based LNG and processing modules.

+++ References

++++ FPSO's


  1. P-33 FPSO
    • Conversion Of V.L.C.C. “Henrique Dias”
    • Petrobras
    • 320m X 54.5m X 27.8m
    • EPIC
    • Apr. 1996 - Jun. 1998
    • Oil Production : 50,000 Bopd, Total : 279,749 M/T, Gas Compression : 2.0 Mmscmd, Class : Abs Class, Storage Capacity : 2.0 Mmbbl, Offloading : 150,000 Bopd
  2. P-35 FPSO
    • Conversion Of V.L.O.O. “Jose Bonifacio”
    • Petrobras
    • 320m X 54.5m X 28m
    • EPIC
    • Jun. 1996 - Dec. 1998 Oil Production
    • 100,000 bpd, Dead Weight : 270,358 M/T Gas Compression : 3.0 Mmscmd, Class : Abs Class, Storage Capacity : 2.0 Mmbbl, Offloading : 150,000 bpd
  3. Girassol FPSO
    • Total
    • 300m X 59.6m X 30.5m
    • EPIC
    • Jun. 1999 - Feb. 2001
    • Oil Production : 200,000 Bopd, Dead Weight : 343,000 Dwt, Water Injection : 250,000 Bwpd, Total : 60,000 M/T Storage Capacity : 2.0 Mmbbl, Accommodation : 140 Men
  4. Kizomba A FPSO
    • Exxon
    • 285m X 63m X 32.2m
    • EPC
    • Jul. 2001 - Jun. 2004
    • Oil Production : 250,000 Bopd, Total : 80,661 M/T, Gas Production : 400 Mmcfd, Storage Capacity : 2.2 Mmbbl, Accommodation : 100 Men
  5. Kizomba B FPSO
    • Exxon
    • 285m X 63m X 32.2m
    • EPC
    • Dec. 2002 - Oct. 2005
    • Oil Production : 250,000 Bopd, Total : 80,661 M/T, Gas Production : 400 Mmcfd, Storage Capacity : 2.2 Mmbbl, Accommodation : 100 Men
  6. Greater Plutonio FPSO
    • BP
    • 310m X 58m X 32m
    • EPC
    • Jan. 2004 - Apr. 2007
    • Oil Production : 250,000 Bopd, Total : 72,700 M/T, Topsides : Ic Gas Production : 8 Mmscmd, Storage Capacity : 2.0 Mmbbl, Accommodation : 120 Men
  7. AKPO FPSO
    • Total
    • 310m X 61m X 31m
    • May 2005 - Nov. 2008
    • L/Q Spread Moored, Total : 98,450 M/T
  8. Moho Bilondo Oil Field
    • TOTAL E & P
    • Congo
    • FPU : 188.5 m x 34 m x 12.5 m, 28,433t
    • EPIC
    • Jun. 2005 ~ Feb. 2008
  9. Usan FPSO
    • TOTAL
    • Nigeria
    • FPSO : 320 m x 61 m x 32 m, 114,092t
    • EPC
    • Feb. 2008 ~ Nov. 2012
  10. Goliat FPSO
    • Eni Norge
    • Norway
    • FPSO : 90 m x 75 m (Cylindrical Type), 51,384t
    • EPC
    • Feb. 2010 ~ Apr. 2015
  11. Glen Lyon FPSO
    • BP
    • UK
    • FPSO : 270 m x 52 m x 30 m 84,424t
    • EPC
    • Feb. 2011 ~ Dec. 2015
  12. Rose Bank FPSO
    • Chevron
    • UK
    • FPSO: 292 m x 57.4 m x 30 m, 99,754t
    • EPC
    • Apr. 2013 ~ Dec. 2019

++++ Others

  1. Amenam/Kpono FSO
    • Total
    • 298m X 62m X 32m
    • EPC
    • Sep. 2000 - Dec. 2002
    • Storage Capacity : 2.4 Mmbbl, Total : 43,500 M/T (T & I : Sbm) Displacement : Max. 340,000dwt, Design Life : 25 Years
  2. Na Kika Semi-Submersible FPU
    • Shel
    • 31,609 M/T
    • PCT
    • Feb 2001 - Jan. 2003 Oil Production, Gas Production : 325 Mmcfd
  3. West Seno FP
    • Unocal
    • 152m X 38m X 10m
    • EPIC
    • Aug. 2001 - Jul. 2003
    • Tlp : 50m X 50m X 40m Pipeline (2 Lines) : 12” X 62 Km, Total : 28,350 M/T
  4. Moho Bilondo FPU
    • Total
    • 188.5m X 34m X 12.5m
    • Epic
    • Jun. 2005 - Feb. 2008
  5. Troll-C FPU
    • Hull Construction
    • Norsk Hydro
    • 14,100 M/T
    • EPCT
    • Apr. 1997 - Nov. 1998
    • (Gva 8000) - Contractor : Umoe Haugesung
  6. Delta House Oil and Gas Field - FPS Hull
    • LLOG
    • GoM
    • Semisub FPS: 81.6 m x 81.6 m x 51.6m 11,372t
    • ePC
    • Aug. 2012 ~ Feb. 2014
  7. Aasta Hansteen Spar Hull Statoil Norway Spar Hull : 196 m (H), 50 m (D) EPC Aug. 2012 ~ Mar. 2016 45,332
  8. Aasta Hansteen Topside Statoil Norway Topside : 60 m x 50 m x 18 m EPC Jan. 2013 ~ Apr. 2017 21,500
  9. Moho Nord TLP EPSCC (Ph.3) Total E&P Congo Congo Tension Leg Platform : 61.5 m x 61.5 m 19 EPC Feb. 2013 ~ Nov. 2015 14,570
  10. Moho Nord FPU Total E&P Congo Congo FPU : 250 m x 44 m x 18 m EPC Mar. 2013 ~ Jun. 2016 62,200
  11. Jangkrik FPU Hull / LQ Eni Indonesia Hull :200 m x 46 m x 15 m EPC Feb. 2014 ~ Mar. 2016 28,745