Huelva LNG Terminal

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Ownership: Enagas
  • Website: http://www.enagas.es/
  • Location: The plant is located at the mouth of the rivers Tinto and Odiel, Huelva
  • Capacity: million tons/annum
  • Status: In Operation

Brief Description

  • A large regasification terminal

Technical Details

  • Storage capacity: 60,000 m3 + 105,000 m3 + 2 * 150,000 m3
  • Unloading capacity:
  • Send out capacity:
  • Constructor:
    • Expansion:
    • **Foster Wheeler** - Detailed engineering, equipment and material procurement, and construction supervision
    • **Freyssinet:** Pre-stressing for LNG tanks 3,4 &5
    • **Saipem:** Construction of tanks 3 & 4


Ongoing Projects/Project Status

  • A fifth tank of capacity 150.000 m3 is under construction

Suppliers / Customers

  • Suppliers:
  • Customers:


History

  • 1988 - Terminal commences operations with a single tank of 60,000 m3
  • 1992 - The second tank (105,000 m3) came into operation
  • 2002 - Foster Wheeler awarded detailed engineering, equipment and material procurement, and construction supervision for expansion
  • 2004 - The third tank (150,000 m3) came into operation
  • 2006 - The fourth tank (150,000 m3) came into operation

=== Other Information

  • -

Links

  1. Terminal Webpage
  2. Freyssinet LNG Tank References
  3. Saipem LNG References
  4. Foster Wheeler Iberia Wins Two LNG Terminal Expansion Projects in Spain