Difference between revisions of "Hrvatska LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (→Links) |
Abarrelfull (talk | contribs) (→Links) |
||
Line 39: | Line 39: | ||
=== Links === | === Links === | ||
# [http://killajoules.wikidot.com/blog:3107 Declaration For Cooperation Between Gaz-System S.A. And The Croatian Gas Transmission System Operator Plinacro D.O.O.] | # [http://killajoules.wikidot.com/blog:3107 Declaration For Cooperation Between Gaz-System S.A. And The Croatian Gas Transmission System Operator Plinacro D.O.O.] | ||
− | + | # [https://a-barrel-full.blogspot.com/2020/08/state-aid-commission-approves-public.html State aid: Commission approves public support for Croatian LNG terminal at Krk island] | |
− | State aid: Commission approves public support for Croatian LNG terminal at Krk island |
Revision as of 17:37, 20 August 2020
Contents
Summary Information
- Ownership: LNG Hrvatska
- Website: http://www.lng.hr/en/
- Location: Island of Krk
- Capacity: 4-6 million tons/annum
- Status: Under construction
Brief Description
- The LNG receiving terminal will be located in Omišalj county on the Island of Krk in Croatia, North Adriatic
Technical Details
- Storage capacity: Tank capacity (full containment): 2x180.000 m³
- Unloading capacity: Size of LNG supply ships: 75,000 - 265,000 m³
- Send out capacity:
- Constructor:
Ongoing Projects/Project Status
- Commissioning is expected in 2020
Suppliers / Customers
- Suppliers:
- Customers:
History
- 2015 - Project awarded strategic status by the Croatian Government
History
2015 - Project awarded strategic status by the Croatian Government Other Information
-