Difference between revisions of "Hrvatska LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Ownership: LNG Hrvatska * Website: http://www.lng.hr/en/ * Location: Island of Krk * Capacity: 4-6 million tons/annum * Status: Under constructi...") |
Abarrelfull (talk | contribs) |
||
Line 23: | Line 23: | ||
* Customers: | * Customers: | ||
=== History === | === History === | ||
+ | * 2015 - Project awarded strategic status by the Croatian Government | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
=== History === | === History === | ||
Revision as of 17:21, 20 August 2020
Contents
Summary Information
- Ownership: LNG Hrvatska
- Website: http://www.lng.hr/en/
- Location: Island of Krk
- Capacity: 4-6 million tons/annum
- Status: Under construction
Brief Description
- The LNG receiving terminal will be located in Omišalj county on the Island of Krk in Croatia, North Adriatic
Technical Details
- Storage capacity: Tank capacity (full containment): 2x180.000 m³
- Unloading capacity: Size of LNG supply ships: 75,000 - 265,000 m³
- Send out capacity:
- Constructor:
Ongoing Projects/Project Status
- Commissioning is expected in 2020
Suppliers / Customers
- Suppliers:
- Customers:
History
- 2015 - Project awarded strategic status by the Croatian Government
History
2015 - Project awarded strategic status by the Croatian Government Other Information
-
Links
Declaration For Cooperation Between Gaz-System S.A. And The Croatian Gas Transmission System Operator Plinacro D.O.O.015 - Project awarded strategic status by the Croatian Government
Other Information
-
Links
Declaration For Cooperation Between Gaz-System S.A. And The Croatian Gas Transmission System Operator Plinacro D.O.O.