Hong Kong LNG Terminal

From A Barrel Full
Revision as of 12:55, 16 December 2021 by Abarrelfull (talk | contribs) (→‎Links)
Jump to navigation Jump to search

Summary Information

Brief Description

  • The scope of the Project involves the construction and operation of the following key infrastructure facilities:
    • One FSRU vessel equipped with LNG storage tanks and regasification equipment;
    • One double berth jetty with mooring facilities for the FSRU vessel and LNG carriers;
    • Two subsea gas pipelines connecting the Offshore LNG Terminal with the Black Point Power Station (BPPS) and the Lamma Power Station (LPS) respectively; and
    • Gas Receiving Stations (GRSs) located inside the BPPS and LPS respectively.

Technical Details

  • Storage capacity:
  • Unloading capacity:
  • Send out capacity:
  • Constructor:
  • Licensor:

Ongoing Projects/Project Status

Suppliers / Customers

  • Suppliers:
  • Customers:

History

  • 200X -

Other Information

-

Links

  1. MOL and Vopak reach agreement to jointly own and operate the FSRU for the new LNG terminal in Hong Kon