Difference between revisions of "Hong Kong LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Ownership: * Website: http://env.hkolng.com/ * Location: * Capacity: million tons/annum * Status: === Brief Description === * The scope of th...") |
Abarrelfull (talk | contribs) (→Links) |
||
Line 34: | Line 34: | ||
- | - | ||
=== Links === | === Links === | ||
− | # | + | # [https://lng-news.blogspot.com/2021/12/mol-and-vopak-reach-agreement-to.html MOL and Vopak reach agreement to jointly own and operate the FSRU for the new LNG terminal in Hong Kon] |
Revision as of 12:55, 16 December 2021
Contents
Summary Information
- Ownership:
- Website: http://env.hkolng.com/
- Location:
- Capacity: million tons/annum
- Status:
Brief Description
- The scope of the Project involves the construction and operation of the following key infrastructure facilities:
- One FSRU vessel equipped with LNG storage tanks and regasification equipment;
- One double berth jetty with mooring facilities for the FSRU vessel and LNG carriers;
- Two subsea gas pipelines connecting the Offshore LNG Terminal with the Black Point Power Station (BPPS) and the Lamma Power Station (LPS) respectively; and
- Gas Receiving Stations (GRSs) located inside the BPPS and LPS respectively.
Technical Details
- Storage capacity:
- Unloading capacity:
- Send out capacity:
- Constructor:
- Licensor:
Ongoing Projects/Project Status
Suppliers / Customers
- Suppliers:
- Customers:
History
- 200X -
Other Information
-