Hawiyah Gas Processing Plant

From A Barrel Full
Revision as of 10:18, 3 May 2024 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Ownership: Saudi Aramco * Website: * Location: 220 kilometers south of Dhahran * Capacity: 2.4 billion scfd +++ Brief Description * The plant was orig...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Summary Information

  • Ownership: Saudi Aramco
  • Website:
  • Location: 220 kilometers south of Dhahran
  • Capacity: 2.4 billion scfd

+++ Brief Description

  • The plant was originally designed to process 1.6 billion standard cubic feet per day (scfd) of raw non-associated gas from wells in the [[[Ghawar Oil Field]]] and produce 1.4 billion scfd of sales gas and 170,000 bpd of condensate.
  • The plant was the first company plant to process non-associated gas

+++ Contractors

  • **Saipem:** Gas Treating and Compression Facilities at Hawiyah NGL Recovery Plant
  • **JGC:** Gas Treating - 1,600 MMSCFD

++++ Related Oil and Gas Fields

  • [[[Ghawar Oil Field]]]

+++ Ongoing Projects

  • -

+++ Other Information

  • -

+++ History

  • 2001 - Operations started
  • 2009 - Capacity increased from 1.6 billion to 2.4 billion scfd

+++ Relevant Links

  1. Technip Oil And Gas Processing References
  2. JGC Oil And Gas Processing References
  3. Saipem Acid Gas Removal References
  4. Otepi Refinery References