+++ History
 
+++ History
 +
* 1956 - Hassi Rmel discovered
 
* 2001 - JGC Wins a Contract to build Gas Boosting Compressor Stations
 
* 2001 - JGC Wins a Contract to build Gas Boosting Compressor Stations
 
* 2006 - Saipem awarded Pipeline EPC contract
 
* 2006 - Saipem awarded Pipeline EPC contract
Line 28: Line 29:
  
 
+++ Links
 
+++ Links
 +
# [[Total Upstream History in Africa]]
 
# [[JGC Oil And Gas Processing References]]
 
# [[JGC Oil And Gas Processing References]]
 
# [http://killajoules.wikidot.com/archive:jgc-wins-a-contract-to-build-gas-boosting-compressor JGC Wins a Contract to build Gas Boosting Compressor Stations in Algeria]
 
# [http://killajoules.wikidot.com/archive:jgc-wins-a-contract-to-build-gas-boosting-compressor JGC Wins a Contract to build Gas Boosting Compressor Stations in Algeria]
 
# [http://killajoules.wikidot.com/archive:saipem-awarded-285-million-euro-onshore-contract-in Saipem awarded 285 million euro onshore contract in Algeria]
 
# [http://killajoules.wikidot.com/archive:saipem-awarded-285-million-euro-onshore-contract-in Saipem awarded 285 million euro onshore contract in Algeria]
 
# [http://killajoules.wikidot.com/blog:5983 Amec Foster Wheeler awarded consultancy contract by Sonatrach in Algeria]
 
# [http://killajoules.wikidot.com/blog:5983 Amec Foster Wheeler awarded consultancy contract by Sonatrach in Algeria]

Revision as of 10:55, 5 December 2023

Summary Information

  • Operator: Sonatrach
  • Country: Algeria
  • Location: 400 km south of Algier
  • Production start:
  • Partners:
  • Type: Gas
  • Estimated Reserves:
  • Production Volume:

+++ Description

  • The Hassi R’Mel gas field, is one of the largest gas fields in the world
  • The fields serves as the hub for all gas pipelines in the Sahara
  • LPG is transported via the [[[LZ2 Hassi R’mel – Arzew Pipeline]]]
  • The field supplies the European market via the [[[Trans Mediterranean Pipeline]]]

+++ Contractors

  • **Saipem:** Engineering, procurement and construction of the 24- inch, 495-kilometer LPG pipeline
  • **JGC:** Design, procurement and construction services for Gas Boosting Compressor Stations

+++ History

  • 1956 - Hassi Rmel discovered
  • 2001 - JGC Wins a Contract to build Gas Boosting Compressor Stations
  • 2006 - Saipem awarded Pipeline EPC contract
  • 2015 - Amec Foster Wheeler awarded consultancy contract

+++ Geology

+++ Links

  1. Total Upstream History in Africa
  2. JGC Oil And Gas Processing References
  3. JGC Wins a Contract to build Gas Boosting Compressor Stations in Algeria
  4. Saipem awarded 285 million euro onshore contract in Algeria
  5. Amec Foster Wheeler awarded consultancy contract by Sonatrach in Algeria