Difference between revisions of "Hasdrubal Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 29: | Line 29: | ||
* 2007 - Heerema awarded the engineering, procurement, construction, transportation and installation (EPCI) of the Hasdrubal A platform | * 2007 - Heerema awarded the engineering, procurement, construction, transportation and installation (EPCI) of the Hasdrubal A platform | ||
* 2009 - Production began | * 2009 - Production began | ||
+ | * 2015 - Shell becomes a partner after acquiring BG Group | ||
+++ Geology | +++ Geology | ||
Line 43: | Line 44: | ||
# [http://killajoules.wikidot.com/archive:construction-hasdrubal-platform-well-under-way/ Construction Hasdrubal platform well under way] | # [http://killajoules.wikidot.com/archive:construction-hasdrubal-platform-well-under-way/ Construction Hasdrubal platform well under way] | ||
# [http://killajoules.wikidot.com/archive:cladtek-completes-delivery-of-british-gas-hasdrubal Cladtek completes delivery of British Gas Hasdrubal CRA Flowlines] | # [http://killajoules.wikidot.com/archive:cladtek-completes-delivery-of-british-gas-hasdrubal Cladtek completes delivery of British Gas Hasdrubal CRA Flowlines] | ||
+ | # [https://abarrelfull.blogspot.com/2023/09/recommended-cash-and-share-offer-for-bg.html Recommended cash and share offer for BG Group by Royal Dutch Shell] |
Revision as of 18:57, 2 March 2024
Summary Information
- Operator: BG Group
- Country: Tunisia
- Location: Offshore, Gulf of Gabes
- Production start: 2009
- Partners:
- BG Group 50%,
- Entreprise Tunisienne d’Activités Pétrolières (ETAP) 50%
- Type: Gas & condensate
- Estimated Reserves:
- Production Volume:
+++ Description
- The Hasdrubal onshore gas processing facility (BG Group 50%, ETAP 50%) and LPG production facility (100% BG Group) have been built adjacent to the Hannibal plant. Gas is sold to STEG while liquids and LPG are exported or sold in the local market.
- Hasdrubal A platform consists of a 1,000 ton jacket and a 1,500 ton topside
+++ Contractors
- **Petrofac:** Front-end engineering and design (FEED) for the development of the Hasdrubal field
- **Heerema:** Engineering, procurement, construction, transportation and installation (EPCI) of the Hasdrubal A platform
- **Saipem:** Offshore Pipeline installation
- **Cladtek:** CRA Flowlines
- **FoundOcean:** Hasdrubal A grouting
+++ History
- 1975 - The Hasdrubal field was first discovered by Elf
- 1998 - Successful appraisal wells drilled
- 2002 - BG finds light oil in the Hasdrubal South West extension
- 2005 - Petrofac Awarded Hasdrubal Development FEED
- 2007 - Heerema awarded the engineering, procurement, construction, transportation and installation (EPCI) of the Hasdrubal A platform
- 2009 - Production began
- 2015 - Shell becomes a partner after acquiring BG Group
+++ Geology
+++ Links
- BG Group Tunisia
- [[[FoundOcean Subsea References]]
- Saipem Africa Pipeline References
- Oil And Gas Concessions In Tunisia
- Petrofac Awarded Hasdrubal Development FEED
- BG Tunisia completes successful Hasdrubal SW-1 well
- Success For Tunisian Appraisal Well
- Construction Hasdrubal platform well under way
- Cladtek completes delivery of British Gas Hasdrubal CRA Flowlines
- Recommended cash and share offer for BG Group by Royal Dutch Shell