Line 16: | Line 16: | ||
* Storage capacity: 2x 160,000 M3 | * Storage capacity: 2x 160,000 M3 | ||
* Constructor: | * Constructor: | ||
− | * Licensor: | + | ** '''KBR:''' Federal Energy Regulatory Commission (FERC) FEED engineering and FERC report pre-filing services |
+ | * Licensor: Air Products | ||
=== Ongoing Projects/Project Status === | === Ongoing Projects/Project Status === |
Latest revision as of 14:09, 19 January 2022
Contents
Summary Information
- Ownership: Kinder Morgan
- Website: https://www.kindermorgan.com/
- Location: Jackson County, Miss
- Capacity: 10.0 million tons/annum
- Status: Planned
Brief Description
- The project is the conversion of Gulf Pascagoula LNG Terminal into a liquefaction plant
- Phase I will consist of a single liquefaction train expected to have a base LNG production capacity of approximately 5 million tonnes per annum (MTPA).
- The LNG produced by this train will be stored in the terminal’s two existing LNG storage tanks which have a combined capacity of 320,000 cubic meters
- Phase II of the project will consist of a second liquefaction train identical in size to the first train, providing a total project base level liquefaction capacity of 10 MTPA
Technical Details
- Storage capacity: 2x 160,000 M3
- Constructor:
- KBR: Federal Energy Regulatory Commission (FERC) FEED engineering and FERC report pre-filing services
- Licensor: Air Products
Ongoing Projects/Project Status
- Commissioning is expected in [[[LNG Terminals to be Completed in 201X | 201X]]]
Suppliers / Customers
- Suppliers:
- Customers:
History
- 2014 - Kinder Morgan became the owner after merging with El Paso