Difference between revisions of "Guarimena–Santiago Oil Pipeline"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "=== Summary Information === * Source: * Destination: * Ownership: * Website: * Length: kilometres ( miles) * Capacity: barrels of oil per day * Crude Type: === Brief...")
 
 
Line 26: Line 26:
 
=== Links ===
 
=== Links ===
  
# -
+
# [https://sierracolenergy.com/central-llanos/ SierraCol Energy]
  
 
[[category:Pipeline]]
 
[[category:Pipeline]]
 
[[category:Country]]
 
[[category:Country]]
 
[[category:Company]]
 
[[category:Company]]

Latest revision as of 10:05, 20 February 2024

Summary Information

  • Source:
  • Destination:
  • Ownership:
  • Website:
  • Length: kilometres ( miles)
  • Capacity: barrels of oil per day
  • Crude Type:

Brief Description

  • The pipeline transports all the crude oil produced in the Central Llanos fields from the Paloblanco Station, to the Santiago Station.


Pipeline Status

  • In operation

History

  • -

Other Information

  • -

Links

  1. SierraCol Energy