Abarrelfull (talk | contribs) (Created page with "Summary Information Ownership: CNPC Website: http://www.cnpc.com.cn/ List of CNPC LNG Terminals Location: Hainan, China Capacity: million tons/annum Status: Planned Brief Desc...") |
Abarrelfull (talk | contribs) |
||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
− | Ownership: | + | |
− | Website: http://www. | + | * Ownership: Guangdong Dapeng LNG Company (CNOOC / BP) |
− | + | * Website: http://www.dplng.com/ | |
− | Location: | + | ** [[CNOOC LNG Terminals]] |
− | Capacity: million tons/annum | + | * Location: Dapeng, Guangdong |
− | Status: | + | * Capacity: 3.7 million tons/annum |
− | Brief Description | + | * Status: In Operation |
− | + | ||
− | Technical Details | + | +++ Brief Description |
− | Storage capacity: | + | * The first LNG import terminal to be built in China |
− | Unloading capacity: | + | |
− | Send out capacity: | + | +++ Technical Details |
− | Constructor: | + | * Storage capacity: three 160,000 M3 superscript LNG storage tanks |
− | + | * Unloading capacity: Berth capable of accommodating 80,000~260,000 M3 LNG carriers | |
− | Ongoing Projects/Project Status | + | * Send out capacity: |
− | + | * Constructor: | |
− | Suppliers / Customers | + | ** **JGC and Halliburton KBR:** FEED |
− | Suppliers: | + | ** **Atkins** was appointed by the BP/CNOOC as the International Consultant for the ESIA Study |
− | Customers: | + | ** **Saipem, Tecnimont and Sofregaz:** Lump sum turnkey contract for the engineering, procurement, construction (EPC) and start-up |
− | History | + | ** **Freyssinet:** LNG Tank post-tensioning |
− | + | ||
− | Other Information | + | |
− | - | + | +++ Ongoing Projects/Project Status |
− | + | * Phase 2 of the terminal will expand capacity | |
− | + | * This extension comprises mainly the fourth LNG tank as well as equipment and additional material associated | |
+ | * Total capacity upon the completion of Phase II will be about 12.0 million tons per year. | ||
+ | |||
+ | |||
+ | +++ Suppliers / Customers | ||
+ | * Suppliers: Australia [[[North West Shelf LNG]]] Venture and Qatargas | ||
+ | * Customers: | ||
+ | ** Sixty-five percent of the imported LNG is used for power generation customers, while the remaining 35% is allocated to town gas customers Shenzhen, Dongguan, Guangzhou, Foshan and Hong Kong. | ||
+ | ** The gas is delivered via more than 360 km of natural gas pipeline network leading to major population centers | ||
+ | |||
+ | +++ History | ||
+ | * 2002 - FEED contract awarded | ||
+ | * 2003 - The ESIA was approved and verified by the State Environmental Protection Agency and the Guangdong Environmental Protection Bureau | ||
+ | * 2003 - Saipem, Tecnimont and Sofregaz awarded EPC contract | ||
+ | * 2006 - First cargo of LNG arrived | ||
+ | * 2008 - FEED contract awarded to Sofregaz for the extension project | ||
+ | * 2009 - First supply from Qatar | ||
+ | |||
+ | +++ Other Information | ||
+ | * - | ||
+ | |||
+ | === Links === | ||
+ | # [[Freyssinet LNG Tank References]] | ||
+ | # [[Saipem LNG References]] | ||
+ | # [http://killajoules.wikidot.com/archive:jgc-awarded-front-end-engineering-design-for-lng-ter JGC Awarded Front-End Engineering Design for LNG Terminal Project] | ||
+ | # [http://www.atkinsglobal.com/Images/HK_Case_Study_Guangdong_LNG_Terminal_tcm12-2033.pdf Guangdong LNG Terminal & Trunkline Project ESIA, PRC] | ||
+ | # [http://killajoules.wikidot.com/archive:commercial-start-of-guangdong-lng-terminal-and-trunk Commercial Start of Guangdong LNG Terminal and Trunkline Project Commenced] | ||
+ | # [http://killajoules.wikidot.com/archive:guangdong-lng-project-welcomes-its-first-anniversary Guangdong LNG Project Welcomes Its First Anniversary] | ||
+ | # [http://killajoules.wikidot.com/archive:guangdong-china-extension-of-the-lng-terminal Guangdong - China - Extension Of The LNG Terminal] | ||
+ | # [http://killajoules.wikidot.com/archive:bp-celebrates-china-lng-double BP Celebrates China LNG Double] | ||
+ | # [http://killajoules.wikidot.com/archive:guangdong-dapeng-lng-receives-first-lng-cargo-from-q Guangdong Dapeng LNG Receives First LNG Cargo from Qatargas] | ||
+ | # [http://killajoules.wikidot.com/archive:the-guangdong-lng-terminal-project-in-peoples-republ The Guangdong LNG terminal project in Peoples Republic of China for approximately USD 145 million awarded to Saipem] |
Latest revision as of 16:47, 7 January 2022
Summary Information
- Ownership: Guangdong Dapeng LNG Company (CNOOC / BP)
- Website: http://www.dplng.com/
- Location: Dapeng, Guangdong
- Capacity: 3.7 million tons/annum
- Status: In Operation
+++ Brief Description
- The first LNG import terminal to be built in China
+++ Technical Details
- Storage capacity: three 160,000 M3 superscript LNG storage tanks
- Unloading capacity: Berth capable of accommodating 80,000~260,000 M3 LNG carriers
- Send out capacity:
- Constructor:
- **JGC and Halliburton KBR:** FEED
- **Atkins** was appointed by the BP/CNOOC as the International Consultant for the ESIA Study
- **Saipem, Tecnimont and Sofregaz:** Lump sum turnkey contract for the engineering, procurement, construction (EPC) and start-up
- **Freyssinet:** LNG Tank post-tensioning
+++ Ongoing Projects/Project Status
- Phase 2 of the terminal will expand capacity
- This extension comprises mainly the fourth LNG tank as well as equipment and additional material associated
- Total capacity upon the completion of Phase II will be about 12.0 million tons per year.
+++ Suppliers / Customers
- Suppliers: Australia [[[North West Shelf LNG]]] Venture and Qatargas
- Customers:
- Sixty-five percent of the imported LNG is used for power generation customers, while the remaining 35% is allocated to town gas customers Shenzhen, Dongguan, Guangzhou, Foshan and Hong Kong.
- The gas is delivered via more than 360 km of natural gas pipeline network leading to major population centers
+++ History
- 2002 - FEED contract awarded
- 2003 - The ESIA was approved and verified by the State Environmental Protection Agency and the Guangdong Environmental Protection Bureau
- 2003 - Saipem, Tecnimont and Sofregaz awarded EPC contract
- 2006 - First cargo of LNG arrived
- 2008 - FEED contract awarded to Sofregaz for the extension project
- 2009 - First supply from Qatar
+++ Other Information
- -
Links
- Freyssinet LNG Tank References
- Saipem LNG References
- JGC Awarded Front-End Engineering Design for LNG Terminal Project
- Guangdong LNG Terminal & Trunkline Project ESIA, PRC
- Commercial Start of Guangdong LNG Terminal and Trunkline Project Commenced
- Guangdong LNG Project Welcomes Its First Anniversary
- Guangdong - China - Extension Of The LNG Terminal
- BP Celebrates China LNG Double
- Guangdong Dapeng LNG Receives First LNG Cargo from Qatargas
- The Guangdong LNG terminal project in Peoples Republic of China for approximately USD 145 million awarded to Saipem