Gryphon Oil Field

From A Barrel Full
Revision as of 07:25, 14 November 2023 by Abarrelfull (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Summary Information

  • Operator: Total
  • Country: UK
  • Location: North Sea
  • Production start:
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

+++ Description

  • The field was developed using the Gryphon FPSO
  • The Tullich field has been developed as a tieback
  • The Maclure Oil Field was developed via a single subsea gas-lifted well tied back to the FPSO

+++ Contractors

  • **Astano:** Construction of FPSO hull
  • **McNulty Offshore:** Construction of topsides

+++ History

  • 1992 - Field development planned approved
  • 2002 - Development consent given for Tullich
  • 2002 - Maclure Oil Field started production
  • 2005 - Maersk acquires the field from Kerr-McGee
  • 2011 - Field temporarily shutdown after FPSO is damaged in storm
  • 2013 - Production resumes following repairs to the FPSO
  • 2017 - Total acquires Maersk and becomes operator

+++ Geology

+++ Links

  1. UK Oil and Gas Fields by Approval Date
  2. List Of Oil Production Platforms In The UK
  3. List Of Oil and Gas Production Platforms In The UK
  4. The A.P. Moller - Maersk Group acquires UK North Sea oil and gas interests
  5. Maersk Oil’s Gryphon FPSO to be docked for repairs
  6. Maersk Oil UK Gryphon FPSO back in production
  7. Total acquires Maersk Oil for $7.45 billion in a share and debt transaction