Greater Western Flank (GWF) Project Gas Fields
Summary Information
Operator: Woodside Country: Australia Location: Offshore north-west coast Production start: Expected 2016 Partners: Type: Gas Estimated Reserves: Production Volume: Description
The GWF Phase 1 Project will develop the Goodwyn GH and Tidepole fields, via a subsea tie-back to the existing Goodwyn A platform GWF-2 will develop the hydrocarbon resources of the Keast, Dockrell, Sculptor, Rankin, Lady Nora and Pemberton fields The gas is to supply North West Shelf LNG Contractors
Phase I
Technip: Load out, transportation and installation of 16 kilometers of 16” gas flow line from the Tidepole manifold to the GWA platform FMC Technologies: Design, manufacture and supply of subsea production systems Aker Solutions: Project management, design, engineering, manufacturing and verification testing of two steel tube umbilicals Phase II
Wood Group Kenny (WGK): Front end engineering design (FEED) of the flowline system, and associated procurement support Flowline system detailed design and support the related procurement and construction processes FMC Technologies: subsea production trees, wellheads, manifolds, subsea and topside controls, and flowline connection systems. History
2011 - Greater Western Flank Phase 1 Project approved 2012 - Equipment and installation contracts awarded 2015 - FEED awarded for phase II Geology
Links
Serimax Pipeline References NWS Project Approves Greater Western Flank Phase 1 Project FMC Technologies Awarded $150 Million Subsea Systems Contract for Greater Western Flank Phase 1 Project Technip awarded subsea installation contract in Australia Aker Solutions secures umbilical contract in Australia Wood Group Kenny awarded FEED contract on Woodside’s proposed Greater Western Flank Phase 2 development FMC Technologies Awarded $180 Million Subsea Systems Contract on Australian Project from Woodside Wood Group wins further design contract for GWF-2