Difference between revisions of "Greater Tortue FLNG Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(10 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
− | * Ownership: | + | * Ownership: BP / Kosmos |
− | * Website: | + | * Website: https://www.bp.com/ |
− | * Location: | + | * Location: Mauritania and Senegal |
− | * Capacity: million tons/annum | + | * Capacity: 2.4 million tons/annum |
− | * Status: | + | * Status: Under Construction |
=== Brief Description === | === Brief Description === | ||
− | * - | + | * The vessel is a converted LNG carrier, with a planned capacity of 2.4 mtpa |
+ | * A second phase will use a gravity-based structure (GBS) with total capacity of between 2.5-3.0 million tonnes per annum. | ||
=== Technical Details === | === Technical Details === | ||
* Storage capacity: | * Storage capacity: | ||
− | * Constructor: | + | * Constructor: |
− | * Licensor: | + | ** **Keppel:** Refurbishment and conversion |
+ | * Licensor: [[LNG Terminals Using Black and Veatch Technology | Black & Veatch]] | ||
=== Ongoing Projects/Project Status === | === Ongoing Projects/Project Status === | ||
Line 19: | Line 21: | ||
=== Suppliers / Customers === | === Suppliers / Customers === | ||
− | * Suppliers: | + | * Suppliers: Gas is to be supplied from the [[Tortue Ahmeyim Oil and Gas Fields]] |
− | * Customers: | + | * Customers: BP will purchase all the gas produced in phase I for an initial term of up to 20 years |
=== History === | === History === | ||
− | * - | + | * 2018 - Golar LNG receives firm order for the vessel |
+ | * 2020 - BP Gas Marketing signed an SPA is for 2.45 million tonnes per annum (MTPA) of liquified natural gas (LNG) from Phase 1 for an initial term of up to 20 years. | ||
+ | * 2023 - Development concept for the second phase of the project launched | ||
=== Other Information === | === Other Information === | ||
Line 29: | Line 33: | ||
=== Links === | === Links === | ||
− | # | + | # [http://killajoules.wikidot.com/archive:golar-lng-receives-limited-notice-to-proceed-for-an Golar LNG receives Limited Notice to Proceed for an FLNG vessel for Phase 1 of the Greater Tortue / Ahmeyim Project, West Africa] |
+ | # [http://killajoules.wikidot.com/archive:keppel-receives-limited-notice-to-proceed-for-gimi-f Keppel Receives Limited Notice To Proceed For Gimi FLNG] | ||
+ | # [http://killajoules.wikidot.com/archive:black-veatch-receives-limited-notice-to-proceed-on-c Black & Veatch receives limited notice to proceed on conversion of FLNG Vessel for BP field development work] | ||
+ | # [https://abarrelfull.blogspot.com/2023/01/greater-tortue-ahmeyim-sale-and.html Greater Tortue Ahmeyim Sale and Purchase Agreement Signed with BP Gas Marketing] | ||
+ | # [https://lng-news.blogspot.com/2023/03/bp-and-partners-progress-concept-for.html bp and partners progress concept for Greater Tortue Ahmeyim (GTA) Phase 2 to next phase of evaluation] | ||
[[category:LNG]] | [[category:LNG]] | ||
− | [[category: | + | [[category:Mauritania]] |
+ | [[category:Senegal]] | ||
[[category:BP]] | [[category:BP]] | ||
[[category:Kosmos]] | [[category:Kosmos]] |
Latest revision as of 15:13, 7 February 2024
Contents
Summary Information
- Ownership: BP / Kosmos
- Website: https://www.bp.com/
- Location: Mauritania and Senegal
- Capacity: 2.4 million tons/annum
- Status: Under Construction
Brief Description
- The vessel is a converted LNG carrier, with a planned capacity of 2.4 mtpa
- A second phase will use a gravity-based structure (GBS) with total capacity of between 2.5-3.0 million tonnes per annum.
Technical Details
- Storage capacity:
- Constructor:
- **Keppel:** Refurbishment and conversion
- Licensor: Black & Veatch
Ongoing Projects/Project Status
- Commissioning is expected in 2023
Suppliers / Customers
- Suppliers: Gas is to be supplied from the Tortue Ahmeyim Oil and Gas Fields
- Customers: BP will purchase all the gas produced in phase I for an initial term of up to 20 years
History
- 2018 - Golar LNG receives firm order for the vessel
- 2020 - BP Gas Marketing signed an SPA is for 2.45 million tonnes per annum (MTPA) of liquified natural gas (LNG) from Phase 1 for an initial term of up to 20 years.
- 2023 - Development concept for the second phase of the project launched
Other Information
- -
Links
- Golar LNG receives Limited Notice to Proceed for an FLNG vessel for Phase 1 of the Greater Tortue / Ahmeyim Project, West Africa
- Keppel Receives Limited Notice To Proceed For Gimi FLNG
- Black & Veatch receives limited notice to proceed on conversion of FLNG Vessel for BP field development work
- Greater Tortue Ahmeyim Sale and Purchase Agreement Signed with BP Gas Marketing
- bp and partners progress concept for Greater Tortue Ahmeyim (GTA) Phase 2 to next phase of evaluation