(Created page with "Summary Information * Ownership: National Grid * Website: http://www.nationalgrid.com * Location: Isle of Grain, Thames Estuary, Near London, UK * Capacity: 14.8 million ton...")
 
 
(4 intermediate revisions by the same user not shown)
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
  
 
* Ownership: National Grid
 
* Ownership: National Grid
Line 7: Line 7:
 
* Status: In Operation  
 
* Status: In Operation  
  
++ Brief Description
+
=== Brief Description ===
 
* A very large regasification terminal capable of supplying 20% of the UK's gas needs
 
* A very large regasification terminal capable of supplying 20% of the UK's gas needs
 +
* After phase 3, the terminal includes a second jetty, able to take the world's largest LNG carriers - the Q-Max
 +
* The terminal acts as a tolling facility, renting out capacity
  
+++ Technical Details
+
=== Technical Details ===
 
* Storage capacity:
 
* Storage capacity:
* Phase 1: four existing LNG storage tanks with a total storage capacity of 200,000 cubic metres
+
** Phase 1: four existing LNG storage tanks with a total storage capacity of 200,000 cubic metres
* Phase 2: three full containment 190,000 cubic metres LNG storage tanks.
+
** Phase 2: three full containment 190,000 cubic metres LNG storage tanks.
* Phase 3: One 190,000 cubic metres LNG storage tank
+
** Phase 3: One 190,000 cubic metres LNG storage tank
 +
** Phase 4: One 190,000 cubic metres LNG storage tank (under construction)
 
* Unloading capacity: Capable of berthing and unloading Q-Max vessels, the largest available LNG carriers in the world
 
* Unloading capacity: Capable of berthing and unloading Q-Max vessels, the largest available LNG carriers in the world
 
* Send out capacity: 19.7 billion cubic metres of gas per year
 
* Send out capacity: 19.7 billion cubic metres of gas per year
 
* Constructor:  
 
* Constructor:  
* **CB&I:** Complete engineering, procurement and construction (EPC) for phase 2&3
+
** '''CB&I:''' Complete engineering, procurement and construction (EPC) for phase 2&3
* **Freyssinet:** LNG Tank post-tensioning
+
** '''Freyssinet:''' LNG Tank post-tensioning
 +
**'''VINCI''' Construction of the tank for phase 4
  
 +
=== Ongoing Projects/Project Status ===
 +
* The 3rd phase of the terminal was completed in 2010.
 +
* The 4th phase of the terminal will be completed in 2025
  
+++ Ongoing Projects/Project Status
 
* The 3rd phase of the terminal is currently underway to provide an additional five million tonnes of capacity in time for winter 2010/11.
 
* Construction work includes a second jetty, able to take the world's largest LNG carriers - the Q-Max - and an additional full containment LNG storage tank of 190,000m3.  The capacity owners for this phase are Centrica, E.ON and Iberdrola.
 
* A fourth phase is in the planning stage
 
  
+++ Suppliers / Customers
+
=== Suppliers / Customers ===
 
* **Suppliers:**  
 
* **Suppliers:**  
* A 20-year contract is in place with BP/Sonatrach for the first phase of capacity to enable them to import LNG into the UK from other countries.
+
** A 20-year contract is in place with BP/Sonatrach for the first phase of capacity to enable them to import LNG into the UK from other countries.
* E.ON and RasGas have a contract to supply 2 Billion cubic metres per year
+
** E.ON and RasGas have a contract to supply 2 Billion cubic metres per year
* **Customers:**  The expanded capacity has been contracted to three customers, Sonatrach, Centrica and Gaz de France Suez.  
+
* **Customers:**   
 +
** The expanded capacity has been contracted to three customers, Sonatrach, Centrica and Gaz de France Suez.  
 +
** Venture Global has contracted 3 million tonnes per annum (3MTPA) of capacity for 16 years from 2029
  
  
+++ History
+
=== History ===
 
* 2005 - The terminal was commissioned with 3.3 million tons / annum capacity
 
* 2005 - The terminal was commissioned with 3.3 million tons / annum capacity
 
* 2010 - The third phase was completed
 
* 2010 - The third phase was completed
 +
* 2021 - Contract awarded for the phase 4 tank construction
 +
* 2024 - Grain signed a deal with Venture Global for capacity post 2029
  
+++ Other Information
+
=== Other Information ===
 
* -
 
* -
  
+++ Relevant Links
+
=== Links ===
  
 
# [http://www.nationalgrid.com/uk/grainlng Terminal Webpage]
 
# [http://www.nationalgrid.com/uk/grainlng Terminal Webpage]
# [[[Freyssinet LNG Tank References]]]
+
# [[Freyssinet LNG Tank References]]
 
# [http://killajoules.wikidot.com/archive:cb-i-wins-epc-contract-for-lng-terminal-expansion-in CB&I helps the UK build up LNG import network and storage capacity]
 
# [http://killajoules.wikidot.com/archive:cb-i-wins-epc-contract-for-lng-terminal-expansion-in CB&I helps the UK build up LNG import network and storage capacity]
 
# [http://killajoules.wikidot.com/archive:310m-expansion-of-national-grids-grain-lng-terminal £310m expansion of National Grid’s Grain LNG terminal complete]  
 
# [http://killajoules.wikidot.com/archive:310m-expansion-of-national-grids-grain-lng-terminal £310m expansion of National Grid’s Grain LNG terminal complete]  
 
# [http://killajoules.wikidot.com/archive:air-products-supplies-nitrogen-for-landmark-gas-proj Air Products Supplies Nitrogen For Landmark Gas Project]
 
# [http://killajoules.wikidot.com/archive:air-products-supplies-nitrogen-for-landmark-gas-proj Air Products Supplies Nitrogen For Landmark Gas Project]
 
# [http://killajoules.wikidot.com/blog:5209 E.ON and RasGas sign medium-term flexible contract for the supply of LNG]
 
# [http://killajoules.wikidot.com/blog:5209 E.ON and RasGas sign medium-term flexible contract for the supply of LNG]
 +
# [https://abarrelfull.blogspot.com/2024/02/vinci-wins-construction-contract-of.html VINCI wins the construction contract of a liquefied natural gas tank in the UK]
 +
# [https://lng-news.blogspot.com/2024/02/grain-lng-signs-new-deal-with-venture.html Grain LNG signs new deal with Venture Global further strengthening the security of supply of LNG to the United Kingdom]
 +
 +
[[category:LNG]]
 +
[[category:UK]]

Latest revision as of 14:33, 5 February 2024

Summary Information

  • Ownership: National Grid
  • Website: http://www.nationalgrid.com
  • Location: Isle of Grain, Thames Estuary, Near London, UK
  • Capacity: 14.8 million tons/annum
  • Status: In Operation

Brief Description

  • A very large regasification terminal capable of supplying 20% of the UK's gas needs
  • After phase 3, the terminal includes a second jetty, able to take the world's largest LNG carriers - the Q-Max
  • The terminal acts as a tolling facility, renting out capacity

Technical Details

  • Storage capacity:
    • Phase 1: four existing LNG storage tanks with a total storage capacity of 200,000 cubic metres
    • Phase 2: three full containment 190,000 cubic metres LNG storage tanks.
    • Phase 3: One 190,000 cubic metres LNG storage tank
    • Phase 4: One 190,000 cubic metres LNG storage tank (under construction)
  • Unloading capacity: Capable of berthing and unloading Q-Max vessels, the largest available LNG carriers in the world
  • Send out capacity: 19.7 billion cubic metres of gas per year
  • Constructor:
    • CB&I: Complete engineering, procurement and construction (EPC) for phase 2&3
    • Freyssinet: LNG Tank post-tensioning
    • VINCI Construction of the tank for phase 4

Ongoing Projects/Project Status

  • The 3rd phase of the terminal was completed in 2010.
  • The 4th phase of the terminal will be completed in 2025


Suppliers / Customers

  • **Suppliers:**
    • A 20-year contract is in place with BP/Sonatrach for the first phase of capacity to enable them to import LNG into the UK from other countries.
    • E.ON and RasGas have a contract to supply 2 Billion cubic metres per year
  • **Customers:**
    • The expanded capacity has been contracted to three customers, Sonatrach, Centrica and Gaz de France Suez.
    • Venture Global has contracted 3 million tonnes per annum (3MTPA) of capacity for 16 years from 2029


History

  • 2005 - The terminal was commissioned with 3.3 million tons / annum capacity
  • 2010 - The third phase was completed
  • 2021 - Contract awarded for the phase 4 tank construction
  • 2024 - Grain signed a deal with Venture Global for capacity post 2029

Other Information

  • -

Links

  1. Terminal Webpage
  2. Freyssinet LNG Tank References
  3. CB&I helps the UK build up LNG import network and storage capacity
  4. £310m expansion of National Grid’s Grain LNG terminal complete
  5. Air Products Supplies Nitrogen For Landmark Gas Project
  6. E.ON and RasGas sign medium-term flexible contract for the supply of LNG
  7. VINCI wins the construction contract of a liquefied natural gas tank in the UK
  8. Grain LNG signs new deal with Venture Global further strengthening the security of supply of LNG to the United Kingdom