Difference between revisions of "Goldboro LNG Export Terminal Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(One intermediate revision by the same user not shown) | |||
Line 31: | Line 31: | ||
* 2015 - National Energy Board Issues Import and Export Licences | * 2015 - National Energy Board Issues Import and Export Licences | ||
* 2020 - Bechtel awarded contract to develop a comprehensive engineering, procurement, construction and commissioning (“EPCC”) execution plan | * 2020 - Bechtel awarded contract to develop a comprehensive engineering, procurement, construction and commissioning (“EPCC”) execution plan | ||
+ | * 2021 - The project was paused | ||
=== Other Information === | === Other Information === | ||
Line 42: | Line 43: | ||
# [http://killajoules.wikidot.com/blog:5997 National Energy Board Issues Import and Export Licences to Pieridae Energy (Canada) Ltd.] | # [http://killajoules.wikidot.com/blog:5997 National Energy Board Issues Import and Export Licences to Pieridae Energy (Canada) Ltd.] | ||
# [https://abarrelfull.blogspot.com/2021/12/pieridae-engages-epcc-contractor-bechtel.html Pieridae engages EPCC contractor Bechtel] | # [https://abarrelfull.blogspot.com/2021/12/pieridae-engages-epcc-contractor-bechtel.html Pieridae engages EPCC contractor Bechtel] | ||
+ | # [https://abarrelfull.blogspot.com/2022/06/pieridae-evaluating-goldboro-lng.html Pieridae Evaluating Goldboro LNG Strategic Alternatives] |
Latest revision as of 07:57, 30 June 2022
Contents
Summary Information
- Ownership: Pieridae Energy Canada
- Website: http://goldborolng.com/
- Location: Goldboro, Nova Scotia, Canada
- Capacity: 10.0 million tons/annum
- Status: Planned
Brief Description
- Planned to be eastern Canada's first LNG export terminal, the project was originally an import terminal.
- See Goldboro LNG Terminal
- The marine terminal will be designed to accommodate LNG carriers ranging in size from 145,000 m3 to 263,000 m3
Technical Details
- Storage capacity: The on-site gross storage capacity for liquid natural gas (LNG) will be approximately 690,000 m3 in three 230,000 m3 tanks
- Constructor:
- **CB&I:** Front-End Engineering and Design
- Licensor:
Ongoing Projects/Project Status
- Commissioning is expected in 2025
Suppliers / Customers
- Suppliers: The terminal will be supplied with gas via the [[[Maritimes And Northeast Gas Pipeline]]]
- Customers: E.ON Global Commodities has contracted for the full volume
History
- 2012 - Project announced
- 2013 - Pieridae Energy registers Goldboro LNG for Environmental Assessment
- 2014 - CB&I Awarded Front-End Engineering and Design Contract
- 2015 - National Energy Board Issues Import and Export Licences
- 2020 - Bechtel awarded contract to develop a comprehensive engineering, procurement, construction and commissioning (“EPCC”) execution plan
- 2021 - The project was paused
Other Information
- -
Links
- Goldboro LNG Project,
- Energy company to develop Eastern Canadian LNG export facility
- Pieridae Energy registers Goldboro LNG for Environmental Assessment
- CB&I Awarded Front-End Engineering and Design Contract for the Development of the Goldboro LNG Project
- National Energy Board Issues Import and Export Licences to Pieridae Energy (Canada) Ltd.
- Pieridae engages EPCC contractor Bechtel
- Pieridae Evaluating Goldboro LNG Strategic Alternatives