Difference between revisions of "Goldboro LNG Export Terminal Project"

From A Barrel Full
Jump to navigation Jump to search
 
(6 intermediate revisions by the same user not shown)
Line 9: Line 9:
 
=== Brief Description ===
 
=== Brief Description ===
 
* Planned to be eastern Canada's first LNG export terminal, the project was originally an import terminal.
 
* Planned to be eastern Canada's first LNG export terminal, the project was originally an import terminal.
* See [[[Goldboro Lng Terminal]]]
+
* See [[Goldboro LNG Terminal]]
 
* The marine terminal will be designed to accommodate LNG carriers ranging in size from 145,000 m3 to 263,000 m3
 
* The marine terminal will be designed to accommodate LNG carriers ranging in size from 145,000 m3 to 263,000 m3
  
Line 15: Line 15:
 
* Storage capacity: The on-site gross storage capacity for liquid natural gas (LNG) will be approximately 690,000 m3 in three 230,000 m3 tanks
 
* Storage capacity: The on-site gross storage capacity for liquid natural gas (LNG) will be approximately 690,000 m3 in three 230,000 m3 tanks
 
* Constructor:
 
* Constructor:
* **CB&I:** Front-End Engineering and Design
+
** **CB&I:** Front-End Engineering and Design
 
* Licensor:
 
* Licensor:
  
 
=== Ongoing Projects/Project Status ===
 
=== Ongoing Projects/Project Status ===
* Commissioning is expected in [[[LNG Terminals to be Completed in 2018 | 2018]]]
+
* Commissioning is expected in [[LNG Terminals to be Completed in 2025 | 2025]]
  
 
=== Suppliers / Customers ===
 
=== Suppliers / Customers ===
Line 30: Line 30:
 
* 2014 - CB&I Awarded Front-End Engineering and Design Contract
 
* 2014 - CB&I Awarded Front-End Engineering and Design Contract
 
* 2015 - National Energy Board Issues Import and Export Licences
 
* 2015 - National Energy Board Issues Import and Export Licences
 +
* 2020 - Bechtel awarded contract to develop a comprehensive engineering, procurement, construction and commissioning (“EPCC”) execution plan
 +
* 2021 - The project was paused
  
 
=== Other Information ===
 
=== Other Information ===
Line 40: Line 42:
 
# [http://killajoules.wikidot.com/blog:5224 CB&I Awarded Front-End Engineering and Design Contract for the Development of the Goldboro LNG Project]
 
# [http://killajoules.wikidot.com/blog:5224 CB&I Awarded Front-End Engineering and Design Contract for the Development of the Goldboro LNG Project]
 
# [http://killajoules.wikidot.com/blog:5997 National Energy Board Issues Import and Export Licences to Pieridae Energy (Canada) Ltd.]
 
# [http://killajoules.wikidot.com/blog:5997 National Energy Board Issues Import and Export Licences to Pieridae Energy (Canada) Ltd.]
* [ Pieridae engages EPCC contractor Bechtel]
+
# [https://abarrelfull.blogspot.com/2021/12/pieridae-engages-epcc-contractor-bechtel.html Pieridae engages EPCC contractor Bechtel]
 +
# [https://abarrelfull.blogspot.com/2022/06/pieridae-evaluating-goldboro-lng.html Pieridae Evaluating Goldboro LNG Strategic Alternatives]

Latest revision as of 07:57, 30 June 2022

Summary Information

  • Ownership: Pieridae Energy Canada
  • Website: http://goldborolng.com/
  • Location: Goldboro, Nova Scotia, Canada
  • Capacity: 10.0 million tons/annum
  • Status: Planned

Brief Description

  • Planned to be eastern Canada's first LNG export terminal, the project was originally an import terminal.
  • See Goldboro LNG Terminal
  • The marine terminal will be designed to accommodate LNG carriers ranging in size from 145,000 m3 to 263,000 m3

Technical Details

  • Storage capacity: The on-site gross storage capacity for liquid natural gas (LNG) will be approximately 690,000 m3 in three 230,000 m3 tanks
  • Constructor:
    • **CB&I:** Front-End Engineering and Design
  • Licensor:

Ongoing Projects/Project Status

  • Commissioning is expected in 2025

Suppliers / Customers

  • Suppliers: The terminal will be supplied with gas via the [[[Maritimes And Northeast Gas Pipeline]]]
  • Customers: E.ON Global Commodities has contracted for the full volume

History

  • 2012 - Project announced
  • 2013 - Pieridae Energy registers Goldboro LNG for Environmental Assessment
  • 2014 - CB&I Awarded Front-End Engineering and Design Contract
  • 2015 - National Energy Board Issues Import and Export Licences
  • 2020 - Bechtel awarded contract to develop a comprehensive engineering, procurement, construction and commissioning (“EPCC”) execution plan
  • 2021 - The project was paused

Other Information

  • -

Links

  1. Goldboro LNG Project,
  2. Energy company to develop Eastern Canadian LNG export facility
  3. Pieridae Energy registers Goldboro LNG for Environmental Assessment
  4. CB&I Awarded Front-End Engineering and Design Contract for the Development of the Goldboro LNG Project
  5. National Energy Board Issues Import and Export Licences to Pieridae Energy (Canada) Ltd.
  6. Pieridae engages EPCC contractor Bechtel
  7. Pieridae Evaluating Goldboro LNG Strategic Alternatives