− | Summary Information | + | === Summary Information === |
* Operator: Total | * Operator: Total | ||
* Country: Angola | * Country: Angola | ||
Line 9: | Line 9: | ||
* Production Volume: | * Production Volume: | ||
− | + | === Description === | |
* Located in water depths of 1,350 metres, 150 kilometres offshore, Girassol was the largest deepwater development to be brought onstream in the world at the time | * Located in water depths of 1,350 metres, 150 kilometres offshore, Girassol was the largest deepwater development to be brought onstream in the world at the time | ||
* The subsea installations consist of 70 km of infield pipelines linked to three riser towers carrying production to a Floating Production Storage Offloading (FPSO) vessel. The FPSO, the largest of its type ever built, is capable of processing 200,000 barrels of oil per day and storing 2 million barrels | * The subsea installations consist of 70 km of infield pipelines linked to three riser towers carrying production to a Floating Production Storage Offloading (FPSO) vessel. The FPSO, the largest of its type ever built, is capable of processing 200,000 barrels of oil per day and storing 2 million barrels | ||
Line 15: | Line 15: | ||
** Girassol Life Extension (GIRLIFEX) Project: Flexible pipes will be installed bypassing the rigid pipe bundles installed before production began. This will extend the life of the Girassol field | ** Girassol Life Extension (GIRLIFEX) Project: Flexible pipes will be installed bypassing the rigid pipe bundles installed before production began. This will extend the life of the Girassol field | ||
− | + | === Contractors === | |
* **KWsubsea:** Design of a repair system for deep water pipelines | * **KWsubsea:** Design of a repair system for deep water pipelines | ||
* Phase 2 | * Phase 2 | ||
Line 24: | Line 24: | ||
** TechnipFMC: engineering, procurement, and supply of flowlines and connectors | ** TechnipFMC: engineering, procurement, and supply of flowlines and connectors | ||
− | + | === History === | |
* 1996 - Girassol Oil Field discovered | * 1996 - Girassol Oil Field discovered | ||
* 2001 - First production started | * 2001 - First production started | ||
Line 32: | Line 32: | ||
* 2023 - Contract awarded for Girassol Life Extension (GIRLIFEX) Project | * 2023 - Contract awarded for Girassol Life Extension (GIRLIFEX) Project | ||
− | + | === Geology === | |
* | * | ||
− | + | === Links === | |
# [http://www.total.com/en/our-energies/oil/exploration-and-production/projects-and-achievements/girassol-940855.html Total, Girassol] | # [http://www.total.com/en/our-energies/oil/exploration-and-production/projects-and-achievements/girassol-940855.html Total, Girassol] | ||
# [[[Serimax Pipeline References]]] | # [[[Serimax Pipeline References]]] |
Revision as of 09:19, 23 February 2023
Summary Information
- Operator: Total
- Country: Angola
- Location: Block 17
- Production start: 2001
- Partners: Sonangol
- Type: Girassol Crude Oil
- Estimated Reserves:
- Production Volume:
Description
- Located in water depths of 1,350 metres, 150 kilometres offshore, Girassol was the largest deepwater development to be brought onstream in the world at the time
- The subsea installations consist of 70 km of infield pipelines linked to three riser towers carrying production to a Floating Production Storage Offloading (FPSO) vessel. The FPSO, the largest of its type ever built, is capable of processing 200,000 barrels of oil per day and storing 2 million barrels
- Production from the [[[Rosa Oil Field]]] and Jasmim oil field is tied back to the Girassol FPSO
- Girassol Life Extension (GIRLIFEX) Project: Flexible pipes will be installed bypassing the rigid pipe bundles installed before production began. This will extend the life of the Girassol field
Contractors
- **KWsubsea:** Design of a repair system for deep water pipelines
- Phase 2
- **FMC:** manufacture and supply of subsea production equipment
- **Technip:** project management, engineering, fabrication and installation of umbilicals, interconnecting power cable, recovery and disposal of four rigid spools, installation of eight new flexible spools
- **Aker Solutions:** Delivery of two dynamic power and control steel tube umbilicals, one dynamic power cable and ancillary equipment
- Girassol Life Extension (GIRLIFEX) Project
- TechnipFMC: engineering, procurement, and supply of flowlines and connectors
History
- 1996 - Girassol Oil Field discovered
- 2001 - First production started
- 2003 - Start up of satellite field Jasmim
- 2011 - FMC contract for manufacture and supply of subsea production equipment for Phase 2
- 2012 - Technip awarded Phase 2 EPIC contract
- 2023 - Contract awarded for Girassol Life Extension (GIRLIFEX) Project
Geology
Links
- Total, Girassol
- [[[Serimax Pipeline References]]]
- [[[KWsubsea Deepwater Project Highlights References]]]
- Angola's Deepwater Girassol Field Comes on Stream
- Production Start-up of Jasmim, Offshore Angola
- Total Awards $80 Million Subsea Production System Option 3 of Girassol Resource Initiative to FMC Technologies
- Technip awarded substantial contract for the phase 2 of the GirRI project in Angola
- Aker Solutions wins umbilical contract in West Africa
- TechnipFMC Awarded Significant Contract by TotalEnergies EP Angola for Girassol Life Extension (GIRLIFEX) Project