* Operator: ADNOC
 
* Operator: ADNOC
 
* Country: Abu Dhabi
 
* Country: Abu Dhabi
* Location:  
+
* Location: Arabian Gulf
 
* Production start:  
 
* Production start:  
* Partners:  
+
* Partners: The concession has 4 foreign partners, ENI with 25%, Wintershall has 10%  while OMV and Lukoil each have a 5% share.
* Type: Oil / Gas
+
* Type: Gas and condensate
 
* Estimated Reserves:  
 
* Estimated Reserves:  
 
* Production Volume: Planned - 1.5 billion standard cubic feet (bscfd) of natural gas per day
 
* Production Volume: Planned - 1.5 billion standard cubic feet (bscfd) of natural gas per day

Revision as of 10:24, 23 January 2023

Summary Information

  • Operator: ADNOC
  • Country: Abu Dhabi
  • Location: Arabian Gulf
  • Production start:
  • Partners: The concession has 4 foreign partners, ENI with 25%, Wintershall has 10% while OMV and Lukoil each have a 5% share.
  • Type: Gas and condensate
  • Estimated Reserves:
  • Production Volume: Planned - 1.5 billion standard cubic feet (bscfd) of natural gas per day

Description

  • The Ghasha mega-project is the world’s largest offshore sour gas development
  • The concession is located offshore Abu Dhabi and consists of three major gas and condensate development projects Hail, Ghasha and Dalma as well as other offshore oil, gas and condensate fields including Nasr, SARB and Mubarraz.
    • Dalma: Gas conditioning facilities located on Arzanah Island located 80 kilometers from Abu Dhabi

Contractors

  • Artelia and KBR: Project Management Consultancy and artificial islands Design and Survey Contracts
  • Hail & Ghasha
    • FEED: Bechtel
  • Dalma
    • FEED: TechnipFMC
    • Package A: EPC four offshore wellhead towers, pipelines and umbilicals in Hair Dalma, Satah, and Bu Haseer fields valued at $514 million (AED1.89 billion).
    • Package B: Técnicas Reunidas \ Target Engineering JV - EPC of gas conditioning facilities for gas dehydration, compression and associated utilities valued at $950 million (AED3.49 billion)
  • Tecnimont, Technip Energies and Samsung Engineering: Early engineering and procurement works

History

  • 2018 - Eni bought a 25 percent stake the project
  • 2018 - FEED Contracts awarded
  • 2021 - Engineering, procurement and construction (EPC) contracts awarded for Dalma
  • 2022 - ADNOC Drilling awarded drilling contract
  • 2023 - Tecnimont, Technip Energies and Samsung Engineering awarded early engineering and procurement works

Geology

Links

  1. Eni signs Ghasha gas concession with ADNOC strengthening its presence in the United Arab Emirates
  2. ADNOC’s Sour Gas Hail, Ghasha and Dalma Project Takes Critical Next Step
  3. ADNOC Awards $1.46 Billion EPC Contracts for the Dalma Gas Development Project
  4. ADNOC Drilling Confirms $2 Billion Contract Award to Enable Delivery of Ghasha Mega-Project
  5. A JV composed of Tecnimont, Technip Energies and Samsung Engineering awarded early engineering and procurement works contract for a total value of USD 80 million by ADNOC for the Hail & Ghasha Gas Development Project in Abu Dhabi