* The Ghasha mega-project is the world’s largest offshore sour gas development
 
* The Ghasha mega-project is the world’s largest offshore sour gas development
 
* The concession is located offshore Abu Dhabi and consists of three major gas and condensate development projects Hail, Ghasha and Dalma as well as other offshore oil, gas and condensate fields including Nasr, SARB and Mubarraz.
 
* The concession is located offshore Abu Dhabi and consists of three major gas and condensate development projects Hail, Ghasha and Dalma as well as other offshore oil, gas and condensate fields including Nasr, SARB and Mubarraz.
 +
** Dalma: Gas conditioning facilities located on Arzanah Island located 80 kilometers from Abu Dhabi
  
 
=== Contractors ===
 
=== Contractors ===
 +
* Dalma
 +
** Package A: EPC four offshore wellhead towers, pipelines and umbilicals in Hair Dalma, Satah, and Bu Haseer fields valued at $514 million (AED1.89 billion).
 +
** Package B: Técnicas Reunidas \ Target Engineering JV - EPC of gas conditioning facilities for gas dehydration, compression and associated utilities valued at $950 million (AED3.49 billion)
 
* Tecnimont, Technip Energies and Samsung Engineering: Early engineering and procurement works
 
* Tecnimont, Technip Energies and Samsung Engineering: Early engineering and procurement works
  
 
=== History ===
 
=== History ===
 
* 2018 - Eni bought a 25 percent stake the project
 
* 2018 - Eni bought a 25 percent stake the project
 +
* 2021 - engineering, procurement and construction (EPC) contracts awarded for Dalma
 
* 2023 - Tecnimont, Technip Energies and Samsung Engineering awarded early engineering and procurement works
 
* 2023 - Tecnimont, Technip Energies and Samsung Engineering awarded early engineering and procurement works
  
Line 25: Line 30:
 
=== Links ===
 
=== Links ===
 
# [http://killajoules.wikidot.com/archive:eni-signs-ghasha-gas-concession-with-adnoc-strengthe Eni signs Ghasha gas concession with ADNOC strengthening its presence in the United Arab Emirates]
 
# [http://killajoules.wikidot.com/archive:eni-signs-ghasha-gas-concession-with-adnoc-strengthe Eni signs Ghasha gas concession with ADNOC strengthening its presence in the United Arab Emirates]
 +
# [https://abarrelfull.blogspot.com/2023/01/adnoc-awards-146-billion-epc-contracts.html ADNOC Awards $1.46 Billion EPC Contracts for the Dalma Gas Development Project]
 
# [https://a-barrel-full.blogspot.com/2023/01/a-jv-composed-of-tecnimont-technip.html A JV composed of Tecnimont, Technip Energies and Samsung Engineering awarded early engineering and procurement works contract for a total value of USD 80 million by ADNOC for the Hail & Ghasha Gas Development Project in Abu Dhabi]
 
# [https://a-barrel-full.blogspot.com/2023/01/a-jv-composed-of-tecnimont-technip.html A JV composed of Tecnimont, Technip Energies and Samsung Engineering awarded early engineering and procurement works contract for a total value of USD 80 million by ADNOC for the Hail & Ghasha Gas Development Project in Abu Dhabi]
  

Revision as of 07:08, 23 January 2023

Summary Information

  • Operator: ADNOC
  • Country: Abu Dhabi
  • Location:
  • Production start:
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume: Planned - 1.5 billion standard cubic feet (bscfd) of natural gas per day

Description

  • The Ghasha mega-project is the world’s largest offshore sour gas development
  • The concession is located offshore Abu Dhabi and consists of three major gas and condensate development projects Hail, Ghasha and Dalma as well as other offshore oil, gas and condensate fields including Nasr, SARB and Mubarraz.
    • Dalma: Gas conditioning facilities located on Arzanah Island located 80 kilometers from Abu Dhabi

Contractors

  • Dalma
    • Package A: EPC four offshore wellhead towers, pipelines and umbilicals in Hair Dalma, Satah, and Bu Haseer fields valued at $514 million (AED1.89 billion).
    • Package B: Técnicas Reunidas \ Target Engineering JV - EPC of gas conditioning facilities for gas dehydration, compression and associated utilities valued at $950 million (AED3.49 billion)
  • Tecnimont, Technip Energies and Samsung Engineering: Early engineering and procurement works

History

  • 2018 - Eni bought a 25 percent stake the project
  • 2021 - engineering, procurement and construction (EPC) contracts awarded for Dalma
  • 2023 - Tecnimont, Technip Energies and Samsung Engineering awarded early engineering and procurement works

Geology

Links

  1. Eni signs Ghasha gas concession with ADNOC strengthening its presence in the United Arab Emirates
  2. ADNOC Awards $1.46 Billion EPC Contracts for the Dalma Gas Development Project
  3. A JV composed of Tecnimont, Technip Energies and Samsung Engineering awarded early engineering and procurement works contract for a total value of USD 80 million by ADNOC for the Hail & Ghasha Gas Development Project in Abu Dhabi