Difference between revisions of "Ghana FSRU LNG Import Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(5 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
* Ownership: Helios | * Ownership: Helios | ||
− | * Website: | + | * Website: |
* Location: Port of Tema | * Location: Port of Tema | ||
* Capacity: 2 million tons/annum | * Capacity: 2 million tons/annum | ||
− | * Status: | + | * Status: In operation |
− | + | ||
+ | === Brief Description === | ||
+ | * Floating Regas Unit (FRU) works in conjunction with an upgraded 127,500 m3 LNG Carrier, to deliver 250mmscfd natural gas, as well as facilities to bunker, reload or break bulk LNG | ||
+ | * It is connected to shore by a 6 km long pipeline | ||
+ | * The terminal is operated by Reganosa | ||
− | |||
=== Technical Details === | === Technical Details === | ||
* Storage capacity: 170,000 | * Storage capacity: 170,000 | ||
* Unloading capacity: | * Unloading capacity: | ||
− | * Send out capacity: | + | * Send out capacity: 250mmscfd |
* Constructor: | * Constructor: | ||
** Jiangnan Shipyard of China: Floating regasification unit | ** Jiangnan Shipyard of China: Floating regasification unit | ||
** China Harbour Engineering Company: Marine facilities | ** China Harbour Engineering Company: Marine facilities | ||
+ | |||
=== Ongoing Projects/Project Status === | === Ongoing Projects/Project Status === | ||
* Under construction | * Under construction | ||
Line 27: | Line 31: | ||
* 2015 - Contract signed with Golar for the vessel | * 2015 - Contract signed with Golar for the vessel | ||
* 2018 - Construction contracts signed | * 2018 - Construction contracts signed | ||
+ | * 2021 - The terminal began operations | ||
+ | |||
=== Other Information === | === Other Information === | ||
* Golar was to be a partner to the project, but is no longer involved | * Golar was to be a partner to the project, but is no longer involved | ||
Line 34: | Line 40: | ||
# [http://killajoules.wikidot.com/blog:6084 Golar and West African Gas Limited Agree Ghana FSRU Contract] | # [http://killajoules.wikidot.com/blog:6084 Golar and West African Gas Limited Agree Ghana FSRU Contract] | ||
# [https://a-barrel-full.blogspot.com/2020/10/agreement-for-construction-of-tema-lng.html Agreement For Construction Of Tema LNG Terminal Project Signed] | # [https://a-barrel-full.blogspot.com/2020/10/agreement-for-construction-of-tema-lng.html Agreement For Construction Of Tema LNG Terminal Project Signed] | ||
+ | # [https://a-barrel-full.blogspot.com/2020/10/rosneft-and-gnpc-arrange-lng-supply-to.html Rosneft and GNPC arrange LNG supply to Ghana and sign a cooperation agreement] | ||
+ | # [https://abarrelfull.blogspot.com/2022/01/reganosa-to-operate-and-maintain-sub.html Reganosa To Operate And Maintain Sub-Saharan Africa’s First Offshore LNG Receiving Terminal In Ghana] |
Latest revision as of 10:52, 17 January 2022
Contents
Summary Information
- Ownership: Helios
- Website:
- Location: Port of Tema
- Capacity: 2 million tons/annum
- Status: In operation
Brief Description
- Floating Regas Unit (FRU) works in conjunction with an upgraded 127,500 m3 LNG Carrier, to deliver 250mmscfd natural gas, as well as facilities to bunker, reload or break bulk LNG
- It is connected to shore by a 6 km long pipeline
- The terminal is operated by Reganosa
Technical Details
- Storage capacity: 170,000
- Unloading capacity:
- Send out capacity: 250mmscfd
- Constructor:
- Jiangnan Shipyard of China: Floating regasification unit
- China Harbour Engineering Company: Marine facilities
Ongoing Projects/Project Status
- Under construction
- Commissioning is expected in 2020
Suppliers / Customers
- Suppliers: Rosneft is to supply 1.7 million tpa
- Customers:
History
- 2015 - Contract signed with Golar for the vessel
- 2018 - Construction contracts signed
- 2021 - The terminal began operations
Other Information
- Golar was to be a partner to the project, but is no longer involved
-
Links
- Golar and West African Gas Limited Agree Ghana FSRU Contract
- Agreement For Construction Of Tema LNG Terminal Project Signed
- Rosneft and GNPC arrange LNG supply to Ghana and sign a cooperation agreement
- Reganosa To Operate And Maintain Sub-Saharan Africa’s First Offshore LNG Receiving Terminal In Ghana