Difference between revisions of "Gato do Mato Oil and Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 4: | Line 4: | ||
* Location: 200 km offshore Brazil in the Santos Basin | * Location: 200 km offshore Brazil in the Santos Basin | ||
* Production start: | * Production start: | ||
− | * Partners: | + | * Partners: Ecopetrol 30%, TotalEnergies 20% |
* Type: Oil / Gas | * Type: Oil / Gas | ||
* Estimated Reserves: | * Estimated Reserves: | ||
Line 13: | Line 13: | ||
=== Contractors === | === Contractors === | ||
− | * - | + | * '''MODEC:''' FPSO Front-End Engineering and Design (FEED) |
=== History === | === History === | ||
+ | * 2019 - Ecopetrol acquired a 30% stake from Shell | ||
* 2022 - Saipem awarded early-stage engineering services for the FPSO | * 2022 - Saipem awarded early-stage engineering services for the FPSO | ||
* 2024 - Modec awarded Front-End Engineering and Design (FEED) for the FPSO | * 2024 - Modec awarded Front-End Engineering and Design (FEED) for the FPSO | ||
Line 23: | Line 24: | ||
=== Links === | === Links === | ||
+ | # [https://abarrelfull.blogspot.com/2024/04/ecopetrol-acquires-30-of-gato-do-mato.html Ecopetrol acquires 30% of the Gato do Mato discovery in Brazil's Pre-Salt] | ||
# [https://abarrelfull.blogspot.com/2024/04/saipem-awarded-offshore-contract-for.html Saipem: awarded offshore contract for Gato do Mato development in Brazil] | # [https://abarrelfull.blogspot.com/2024/04/saipem-awarded-offshore-contract-for.html Saipem: awarded offshore contract for Gato do Mato development in Brazil] | ||
# [https://a-barrel-full.blogspot.com/2024/04/modec-secures-feed-for-shells-gato-do.html MODEC secures FEED for Shell’s Gato do Mato FPSO project in Brazil] | # [https://a-barrel-full.blogspot.com/2024/04/modec-secures-feed-for-shells-gato-do.html MODEC secures FEED for Shell’s Gato do Mato FPSO project in Brazil] |
Latest revision as of 06:26, 3 April 2024
Summary Information
- Operator: Shell
- Country: Brazil
- Location: 200 km offshore Brazil in the Santos Basin
- Production start:
- Partners: Ecopetrol 30%, TotalEnergies 20%
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- The field will be developed using the Gato do Mato FPSO
Contractors
- MODEC: FPSO Front-End Engineering and Design (FEED)
History
- 2019 - Ecopetrol acquired a 30% stake from Shell
- 2022 - Saipem awarded early-stage engineering services for the FPSO
- 2024 - Modec awarded Front-End Engineering and Design (FEED) for the FPSO