Gasene Gas Pipeline

From A Barrel Full
Revision as of 12:05, 16 February 2024 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Source: Cacimbas, Brazil * Destination: Catu, Brazil * Ownership: Petrobras * Website: http://www.petrobras.com.br/ * Length: 1,375 kilometres ( mile...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Summary Information

  • Source: Cacimbas, Brazil
  • Destination: Catu, Brazil
  • Ownership: Petrobras
  • Website: http://www.petrobras.com.br/
  • Length: 1,375 kilometres ( miles)
  • Capacity: per day
  • Status (Operating/Planned/Under Construction)

+++ Details

  • There are three sections to the pipeline
    • Section 1: Cacimbas-Vitória (129km)
    • Section 2: Cabiúnas-Vitória (300km)
    • Section 3: Cacimbas (ES)-Catu (BA) (946km)

+++ History

  • 2007 - Section 1 began commercial operations
  • 2007 - Petrobras begins construction of the third section

+++ Other Information

  • -

+++ Links