Garden Banks Gas Pipeline

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Source: Garden Banks
  • Destination: South Marsh Island Block 76
  • Ownership: Enbridge
  • Website: http://www.enbridge.com/
  • Length: kilometres (50 miles)
  • Capacity: One billion cubic feet of gas per day.
  • Status: Operating

+++ Details

  • The 30-inch diameter Garden Banks pipeline has a capacity of 1 billion cubic feet per day, and transports production originating from the Auger platform in Garden Banks Block 426, the Enchilada platform in Garden Banks Block 128, the Baldpate platform in Garden Banks Block 260, the platform in South Marsh Island (SMI192) and the Magnolia Platform in Garden Banks 783.
  • It supplies the ANR Pipeline Company & Transcontinental Gas Pipe Line TRANSCO

+++ Related Oil and Gas Fields

+++ History

  • 1997 - Pipeline operations began
  • 2005 - Enbridge acquired a further 20%

+++ Other Information

  • -

+++ Links

  1. Garden Banks Gas Pipeline, LLC
  2. Enbridge Acquires Full Interest in Garden Banks Gas Pipeline