Difference between revisions of "G14, G16 and G17 Gas Fields"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) (→Links) |
||
Line 36: | Line 36: | ||
# [http://killajoules.wikidot.com/archive:gaz-de-france-brings-five-gas-fields-on-stream-in-th Gaz de France brings five gas fields on stream in the Netherlands offshore] | # [http://killajoules.wikidot.com/archive:gaz-de-france-brings-five-gas-fields-on-stream-in-th Gaz de France brings five gas fields on stream in the Netherlands offshore] | ||
# [https://a-barrel-full.blogspot.com/2022/09/well-safe-protector-to-decommission.html Well-Safe Protector to decommission Neptune Energy wells in North Sea] | # [https://a-barrel-full.blogspot.com/2022/09/well-safe-protector-to-decommission.html Well-Safe Protector to decommission Neptune Energy wells in North Sea] | ||
+ | |||
+ | [[category:Field]] | ||
+ | [[category:Netherlands]] | ||
+ | [[category:Neptune]] |
Latest revision as of 07:52, 20 September 2022
Summary Information
- Operator: GDF Suez
- Country: Netherlands
- Location:
- Production start: 2002
- Partners:
- Type: Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- Initially production was from G17-d-A Platform
- The second phase of development consisted of the relocation of two existing platforms and one sub-sea completion, the construction of two new platforms and the laying of 46-km offshore gas pipeline.
- The platforms are; a central production platform, G17d-AP, three satellite platforms, G14-A, G16-A and K2b-A and a subsea completion, G17a-S1
- Gas is transported on the Noordgastransport NGT Gas Pipeline
+++ Contractors
- **Saipem:** Transport and installation of G17-d-A
- **HSM:** G17d-AP Topsides
- **Seaway Heavy Lifting:** Transport & installation of the K2b-A Production Platform
History
- 2002 - First gas from G17-d
- 2005 - G17-d-AP Production Platform installed
- 2006 - Production started
- 2022 - Wellsafe awarded decommissioning contract for platform G14-B