(Created page with "=== Summary Information === * Operator: GDF Suez * Country: Netherlands * Location: * Production start: 2002 * Partners: * Type: Gas * Estimated Reserves: * Production Vol...")
 
 
(2 intermediate revisions by the same user not shown)
Line 20: Line 20:
 
* **Seaway Heavy Lifting:** Transport & installation of the K2b-A Production Platform
 
* **Seaway Heavy Lifting:** Transport & installation of the K2b-A Production Platform
  
+++ History
+
=== History ===
 
* 2002 - First gas from G17-d
 
* 2002 - First gas from G17-d
 
* 2005 - G17-d-AP Production Platform installed
 
* 2005 - G17-d-AP Production Platform installed
 
* 2006 - Production started
 
* 2006 - Production started
 +
* 2022 - Wellsafe awarded decommissioning contract for platform G14-B
  
 
+++ Geology
 
+++ Geology
*  
+
*
  
 
=== Links ===
 
=== Links ===
Line 34: Line 35:
 
# [[Saipem Pipeline References]]
 
# [[Saipem Pipeline References]]
 
# [http://killajoules.wikidot.com/archive:gaz-de-france-brings-five-gas-fields-on-stream-in-th Gaz de France brings five gas fields on stream in the Netherlands offshore]
 
# [http://killajoules.wikidot.com/archive:gaz-de-france-brings-five-gas-fields-on-stream-in-th Gaz de France brings five gas fields on stream in the Netherlands offshore]
 +
# [https://a-barrel-full.blogspot.com/2022/09/well-safe-protector-to-decommission.html Well-Safe Protector to decommission Neptune Energy wells in North Sea]
 +
 +
[[category:Field]]
 +
[[category:Netherlands]]
 +
[[category:Neptune]]

Latest revision as of 07:52, 20 September 2022

Summary Information

  • Operator: GDF Suez
  • Country: Netherlands
  • Location:
  • Production start: 2002
  • Partners:
  • Type: Gas
  • Estimated Reserves:
  • Production Volume:

+++ Description

  • Initially production was from G17-d-A Platform
  • The second phase of development consisted of the relocation of two existing platforms and one sub-sea completion, the construction of two new platforms and the laying of 46-km offshore gas pipeline.
  • The platforms are; a central production platform, G17d-AP, three satellite platforms, G14-A, G16-A and K2b-A and a subsea completion, G17a-S1
  • Gas is transported on the Noordgastransport NGT Gas Pipeline

+++ Contractors

  • **Saipem:** Transport and installation of G17-d-A
  • **HSM:** G17d-AP Topsides
  • **Seaway Heavy Lifting:** Transport & installation of the K2b-A Production Platform

History

  • 2002 - First gas from G17-d
  • 2005 - G17-d-AP Production Platform installed
  • 2006 - Production started
  • 2022 - Wellsafe awarded decommissioning contract for platform G14-B

+++ Geology

Links

  1. Platforms Netherlands Continental Shelf
  2. Seaway Heavy Lifting Oil And Gas References
  3. HSM Offshore Platform References
  4. Saipem Pipeline References
  5. Gaz de France brings five gas fields on stream in the Netherlands offshore
  6. Well-Safe Protector to decommission Neptune Energy wells in North Sea