Difference between revisions of "Fujian LNG Terminal"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information Ownership: CNOOC Website: http://www.cnoocltd.com/ List of CNOOC LNG Terminals Location: Xiuyu, Fujian Province, in southeast China Capacity: 2.6 million t...")
 
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
Ownership: CNOOC
+
 
Website: http://www.cnoocltd.com/
+
* Ownership: CNOOC
List of CNOOC LNG Terminals
+
* Website: http://www.cnoocltd.com/
Location: Xiuyu, Fujian Province, in southeast China
+
* List of [[CNOOC LNG Terminals]]
Capacity: 2.6 million tons/annum
+
* Location: Xiuyu, Fujian Province, in southeast China
Status: In Operation
+
* Capacity: 2.6 million tons/annum  
Brief Description
+
* Status: In Operation
Fujian LNG Overall Project is composed of the 2.6 million ton/annum LNG terminal and trunkline project, three gas-fired power plant projects and 5 city distribution projects.
+
 
Technical Details
+
+++ Brief Description
Storage capacity: two 160,000 cubic meter full containment LNG storage tanks
+
* Fujian LNG Overall Project is composed of the 2.6 million ton/annum LNG terminal and trunkline project, three gas-fired power plant projects and 5 city distribution projects.
Unloading capacity:
+
 
Send out capacity:
+
+++ Technical Details
Constructor: CB&I
+
* Storage capacity: two 160,000 cubic meter full containment LNG storage tanks
Licensor:
+
* Unloading capacity:
History
+
* Send out capacity:  
2002 - Tangguh signed an agreement to supply LNG to the Fujian LNG terminal
+
* Constructor: CB&I
2007 - The purchase and sales contract (revision) of Fujian LNG Project was signed
+
* Licensor:
2009 - Terminal operations begin
+
 
2009 - Expansion project awarded to CB&I
+
+++ History
Ongoing Projects/Project Status
+
* 2002 - [[[Tangguh Lng Terminal | Tangguh]]] signed an agreement to supply LNG to the Fujian LNG terminal
By 2011, the new storage tanks No.3 and No.4 will be put into use, and the annual receiving capacity of Fujian LNG terminal will be doubled to 5.2 million tons.
+
* 2007 - The purchase and sales contract (revision) of Fujian LNG Project was signed  
Suppliers / Customers
+
* 2009 - Terminal operations begin
Suppliers: The main supplier of the first phase is Tangguh LNG Terminal
+
* 2009 - Expansion project awarded to CB&I
Customers: After gasification, part of the gas will be supplied to gas-fired power plants in Putian, Jinjiang and Xiamen via gas transmission trunk lines, and the rest will be sent to enterprises and residents in 5 big cities in Fujian Province including Fuzhou, Putian, Quanzhou, Xiamen and Zhangzhou
+
 
Other Information
+
+++ Ongoing Projects/Project Status
The cold energy from the gasification process is utilised by an Air Separation Unit, built in conjunction with Air Products
+
* By 2011, the new storage tanks No.3 and No.4 will be put into use, and the annual receiving capacity of Fujian LNG terminal will be doubled to 5.2 million tons.
Relevant Links
+
 
Fujian LNG Terminal & Trunkline, CB&I
+
+++ Suppliers / Customers
Fujian LNG Terminal Receives First Cargo from Tangguh
+
* Suppliers: The main supplier of the first phase is [[[Tangguh LNG Terminal]]]
Air Products and CNOOC Bring Onstream China’s First LNG Cold Energy ASU
+
* Customers: After gasification, part of the gas will be supplied to gas-fired power plants in Putian, Jinjiang and Xiamen via gas transmission trunk lines, and the rest will be sent to enterprises and residents in 5 big cities in Fujian Province including Fuzhou, Putian, Quanzhou, Xiamen and Zhangzhou
CB&I Awarded Contract for LNG Expansion Project in China
+
 
CNOOC Fujian Natural Gas Co., Ltd
+
+++ Other Information
Fujian LNG Project Secures Downstream Market
+
* The cold energy from the gasification process is utilised by an Air Separation Unit, built in conjunction with [http://www.airproducts.com Air Products]
Fujian LNG Project Starts Construction of Two More Storage Tanks
+
 
BP At Forefront Of China's LNG Strategy As Fujian Chooses Tangguh
+
=== Links ===
 +
# [http://www.cbi.com/markets/project-profiles/fujian-lng-terminal-trunkline/ Fujian LNG Terminal & Trunkline, CB&I]
 +
# [http://killajoules.wikidot.com/archive:fujian-lng-terminal-receives-first-cargo-from-tanggu Fujian LNG Terminal Receives First Cargo from Tangguh]
 +
# [http://killajoules.wikidot.com/archive:air-products-and-cnooc-bring-onstream-chinas-first-l Air Products and CNOOC Bring Onstream China’s First LNG Cold Energy ASU]
 +
# [http://killajoules.wikidot.com/archive:cb-i-awarded-contract-for-lng-expansion-project-in-c CB&I Awarded Contract for LNG Expansion Project in China]
 +
# [http://www.cnoocgas.com/qidian/company.do;jsessionid=40755AFD423025A896F5198B96AB7D69?actionMethod=list_company&lang=1&pk=20091015090345651104691820304348 CNOOC Fujian Natural Gas Co., Ltd]
 +
# [http://killajoules.wikidot.com/archive:fujian-lng-project-secures-downstream-market Fujian LNG Project Secures Downstream Market]
 +
# [http://killajoules.wikidot.com/archive:fujian-lng-project-starts-construction-of-two-more-s Fujian LNG Project Starts Construction of Two More Storage Tanks]
 +
# [http://killajoules.wikidot.com/archive:bp-at-forefront-of-china-s-lng-strategy-as-fujian-ch BP At Forefront Of China's LNG Strategy As Fujian Chooses Tangguh]

Revision as of 16:10, 7 January 2022

Summary Information

* List of CNOOC LNG Terminals
  • Location: Xiuyu, Fujian Province, in southeast China
  • Capacity: 2.6 million tons/annum
  • Status: In Operation

+++ Brief Description

  • Fujian LNG Overall Project is composed of the 2.6 million ton/annum LNG terminal and trunkline project, three gas-fired power plant projects and 5 city distribution projects.

+++ Technical Details

  • Storage capacity: two 160,000 cubic meter full containment LNG storage tanks
  • Unloading capacity:
  • Send out capacity:
  • Constructor: CB&I
  • Licensor:

+++ History

  • 2002 - [[[Tangguh Lng Terminal | Tangguh]]] signed an agreement to supply LNG to the Fujian LNG terminal
  • 2007 - The purchase and sales contract (revision) of Fujian LNG Project was signed
  • 2009 - Terminal operations begin
  • 2009 - Expansion project awarded to CB&I

+++ Ongoing Projects/Project Status

  • By 2011, the new storage tanks No.3 and No.4 will be put into use, and the annual receiving capacity of Fujian LNG terminal will be doubled to 5.2 million tons.

+++ Suppliers / Customers

  • Suppliers: The main supplier of the first phase is [[[Tangguh LNG Terminal]]]
  • Customers: After gasification, part of the gas will be supplied to gas-fired power plants in Putian, Jinjiang and Xiamen via gas transmission trunk lines, and the rest will be sent to enterprises and residents in 5 big cities in Fujian Province including Fuzhou, Putian, Quanzhou, Xiamen and Zhangzhou

+++ Other Information

  • The cold energy from the gasification process is utilised by an Air Separation Unit, built in conjunction with Air Products

Links

  1. Fujian LNG Terminal & Trunkline, CB&I
  2. Fujian LNG Terminal Receives First Cargo from Tangguh
  3. Air Products and CNOOC Bring Onstream China’s First LNG Cold Energy ASU
  4. CB&I Awarded Contract for LNG Expansion Project in China
  5. CNOOC Fujian Natural Gas Co., Ltd
  6. Fujian LNG Project Secures Downstream Market
  7. Fujian LNG Project Starts Construction of Two More Storage Tanks
  8. BP At Forefront Of China's LNG Strategy As Fujian Chooses Tangguh