Front Runner Oil Field
Jump to navigation
Jump to search
Summary Information
- Operator: Murphy
- Country: USA
- Location: Green Canyon Blocks 338, 339 & 382, Gulf of Mexico
- Production start: 2004
- Partners: Murphy - 37.5%, Eni - 37.5%, Statoil - 25%
- Type: Oil & Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- The Front Runner development is located in 3,100 feet of water and consists of a truss spar facility capable of handling 60,000 barrels of crude oil and 110 million cubic feet of natural gas a day.
- The Spar is a hub for a number of satellite fields including [[[Daniel Boone Oil Field]]] and [[[Clipper Oil and Gas Field]]]
- Oil is exported via the [[[Poseidon Oil Pipeline]]]
+++ Contractors
- **J. Ray McDermott:** Overall project management of the EPIC contract which included the design, engineering, procurement, fabrication, installation and commissioning of the offshore production facility
- **Emerson:** Spar - Engineering, Control System, Safety system
+++ History
- 2001 - Front Runner Oil Field discovered
- 2002 - Project sanctioned
- 2004 - J. Ray McDermott Completes Front Runner Spar Project
- 2004 - First production
- 2005 - Norsk Hydro became a shareholder following the takeover of Spinnaker
- 2007 - Eni acquires a 37.5% stake from Dominion
+++ Geology
+++ Links
- [[[Emerson FPSO References]]]
- [[[Gulf Of Mexico Permanent Deepwater Structures]]]
- [[[Gulf Of Mexico Deepwater Natural Gas And Oil Qualified Fields]]]
- Spinnaker Exploration Company, Operations Update
- J. Ray McDermott Completes Front Runner Spar Project
- Murphy Announces First Production At Front Runner Field
- Enterprise Announces Receipt of New Production Into Poseidon Oil Pipeline System
- Acquisition of Spinnaker completed
- Eni completes the acquisition of Dominion's assets in the Gulf of Mexico