=== Brief Description === | === Brief Description === | ||
* An onshore, mid sized LNG liquefaction plant that will be built in 2 phases | * An onshore, mid sized LNG liquefaction plant that will be built in 2 phases | ||
+ | * The marine loading facility, to be located along Belle Pass, will consist of both a single ship berth and a maneuvering basin. | ||
=== Technical Details === | === Technical Details === | ||
− | * Storage capacity: | + | * Storage capacity: 2x 88,000 m3 tanks |
* Constructor: | * Constructor: | ||
* Licensor: | * Licensor: | ||
Line 21: | Line 22: | ||
=== Suppliers / Customers === | === Suppliers / Customers === | ||
− | * Suppliers: | + | * Suppliers: Natural gas delivery to the site will occur through a short pipeline spur that will consist of a pipeline built to run approximately 600 yards to the west of the Fourchon LNG Facility. The pipeline will connect to an existing pipeline, the [[Kinetica Energy Express Gas Pipeline System]] |
− | * Customers: | + | * Customers: |
=== History === | === History === | ||
− | * - | + | * 2018 - Project FERC authorisation for FTA and non FTA export |
=== Other Information === | === Other Information === | ||
Line 31: | Line 32: | ||
=== Links === | === Links === | ||
− | # | + | # [https://www.energy.gov/sites/prod/files/2018/03/f49/ord4162.pdf FERC Authourisation] |
+ | # [[Long Term Applications Received by DOE/FE]] | ||
[[category:LNG]] | [[category:LNG]] | ||
[[category:USA]] | [[category:USA]] |
Latest revision as of 07:29, 14 February 2024
Contents
Summary Information
- Ownership: Fourchon LNG
- Website: http://fourchonlng.net/
- Location: Port Fourchon, Lafourche Parish, Louisiana
- Capacity:
- Phase I: 2.0 million tons/annum
- Phase II: 5.0 million tons/annum
- Status: Planned
Brief Description
- An onshore, mid sized LNG liquefaction plant that will be built in 2 phases
- The marine loading facility, to be located along Belle Pass, will consist of both a single ship berth and a maneuvering basin.
Technical Details
- Storage capacity: 2x 88,000 m3 tanks
- Constructor:
- Licensor:
Ongoing Projects/Project Status
- Commissioning is expected in 202X
Suppliers / Customers
- Suppliers: Natural gas delivery to the site will occur through a short pipeline spur that will consist of a pipeline built to run approximately 600 yards to the west of the Fourchon LNG Facility. The pipeline will connect to an existing pipeline, the Kinetica Energy Express Gas Pipeline System
- Customers:
History
- 2018 - Project FERC authorisation for FTA and non FTA export