=== Brief Description ===
 
=== Brief Description ===
 
* An onshore, mid sized LNG liquefaction plant that will be built in 2 phases
 
* An onshore, mid sized LNG liquefaction plant that will be built in 2 phases
 +
* The marine loading facility, to be located along Belle Pass, will consist of both a single ship berth and a maneuvering basin.
  
 
=== Technical Details ===
 
=== Technical Details ===
* Storage capacity:
+
* Storage capacity: 2x 88,000 m3 tanks
 
* Constructor:
 
* Constructor:
 
* Licensor:
 
* Licensor:
Line 21: Line 22:
  
 
=== Suppliers / Customers ===
 
=== Suppliers / Customers ===
* Suppliers:  
+
* Suppliers: Natural gas delivery to the site will occur through a short pipeline spur that will consist of a pipeline built to run approximately 600 yards to the west of the Fourchon LNG Facility. The pipeline will connect to an existing pipeline, the [[Kinetica Energy Express Gas Pipeline System]]
* Customers:  
+
* Customers:
  
 
=== History ===
 
=== History ===
* -
+
* 2018 - Project FERC authorisation for FTA and non FTA export
  
 
=== Other Information ===
 
=== Other Information ===
Line 31: Line 32:
  
 
=== Links ===
 
=== Links ===
# -
+
# [https://www.energy.gov/sites/prod/files/2018/03/f49/ord4162.pdf FERC Authourisation]
 +
# [[Long Term Applications Received by DOE/FE]]
  
 
[[category:LNG]]
 
[[category:LNG]]
 
[[category:USA]]
 
[[category:USA]]

Latest revision as of 07:29, 14 February 2024

Summary Information

  • Ownership: Fourchon LNG
  • Website: http://fourchonlng.net/
  • Location: Port Fourchon, Lafourche Parish, Louisiana
  • Capacity:
    • Phase I: 2.0 million tons/annum
    • Phase II: 5.0 million tons/annum
  • Status: Planned

Brief Description

  • An onshore, mid sized LNG liquefaction plant that will be built in 2 phases
  • The marine loading facility, to be located along Belle Pass, will consist of both a single ship berth and a maneuvering basin.

Technical Details

  • Storage capacity: 2x 88,000 m3 tanks
  • Constructor:
  • Licensor:

Ongoing Projects/Project Status

  • Commissioning is expected in 202X

Suppliers / Customers

  • Suppliers: Natural gas delivery to the site will occur through a short pipeline spur that will consist of a pipeline built to run approximately 600 yards to the west of the Fourchon LNG Facility. The pipeline will connect to an existing pipeline, the Kinetica Energy Express Gas Pipeline System
  • Customers:

History

  • 2018 - Project FERC authorisation for FTA and non FTA export

Other Information

  • -

Links

  1. FERC Authourisation
  2. Long Term Applications Received by DOE/FE