Four Vanguard FPSO

From A Barrel Full
Jump to navigation Jump to search

Summary Information

+++ Brief Description

  • The vessel has a Disconnectable Single Point Mooring System, which can quickly disengage the FPSO when faced with cyclone weather conditions
  • The vessel's name has been changed from Four Vanguard FPSO to Four Rainbow FPSO

+++ Contractors

  • **Keppel:** FSPO construction including fabricating and installing a comprehensive topside system, helideck and flare tower.
  • **Premuda:** carried out the detailed design, procurement, fabrication, tanker conversion and FPSO installation for the development
  • ** Dyna-Mac:** Main process module, process control equipment module and riser buoy, sponson and lantern frame

+++ Status

  • In operation

+++ History

  • 2003 - FSPO delivered
  • 2009 - The vessel was dry docked and the name changed to Four Rainbow FPSO
  • 2012 - Production ceases on Woollybutt
  • 2015 - Yinson agrees to buy half of the vessel

+++ Other Information

  • -

+++ Links

  1. Premuda, Woollybutt Project Overview
  2. Keppel FPSO References
  3. International Protective Coatings FPSO References
  4. Keppel Shipyard reaffirmed as a preferred yard by Vanguard with the completion of their first FPSO
  5. Woollybutt Dry Docking Update
  6. Proposed FPSO Joint venture between FVSN and Yinson