Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Operator: Cenovus * Country: Canada * Location: Alberta * Production start: 1996 * Partners: * Type: Oil * Estimated Reserves: * Production Vo...") |
Abarrelfull (talk | contribs) (→Links) |
||
Line 33: | Line 33: | ||
# [http://killajoules.wikidot.com/archive:foster-creek-receives-regulatory-approval-to-expand Foster Creek receives regulatory approval to expand] | # [http://killajoules.wikidot.com/archive:foster-creek-receives-regulatory-approval-to-expand Foster Creek receives regulatory approval to expand] | ||
# [http://killajoules.wikidot.com/blog:5453 Cenovus provides update on Foster Creek] | # [http://killajoules.wikidot.com/blog:5453 Cenovus provides update on Foster Creek] | ||
+ | # [https://abarrelfull.blogspot.com/2022/06/conocophillips-announces-sale-of-foster.html ConocoPhillips Announces Sale of Foster Creek Christina Lake Partnership Interest and Western Canada Deep Basin Gas Assets to Cenovus for $13.3 Billion; Significant Transaction Accelerates Value Proposition] |
Revision as of 11:39, 13 June 2022
Summary Information
- Operator: Cenovus
- Country: Canada
- Location: Alberta
- Production start: 1996
- Partners:
- Type: Oil
- Estimated Reserves:
- Production Volume: 100,000 bpd
Description
- Foster Creek began operating as a steam-assisted gravity drainage (SAGD) project in 1996 and became the industry's first commercial SAGD project in 2001
- Oil from the project is processed at the [[[Wood River Refinery]]]
- Diluent is supplied by the [[[Polaris Diluent Pipeline System]]]
- Oil is transported on the [[[Cold Lake Pipeline System]]] to Edmonton
Contractors
- **Aker Solutions:**
* Engineering -Design, manufacture & supply of 2 Treater Vessels with desand system & option for electrostatics - 14 OD x 100 * 1 FWKO Vessel c/w insulation; Engineering manual desand system & all related piping - 14 OD x 100
History
- 1996 - First Pilot production
- 2001 - Commercial production started
- 2010 - Foster Creek receives regulatory approval for three phases of expansion (F, G and H)
- 2014 - First oil production from Phase F
Geology
Links
- Aker Solutions Oil And Gas Processing References
- Foster Creek receives regulatory approval to expand
- Cenovus provides update on Foster Creek
- ConocoPhillips Announces Sale of Foster Creek Christina Lake Partnership Interest and Western Canada Deep Basin Gas Assets to Cenovus for $13.3 Billion; Significant Transaction Accelerates Value Proposition