Flamboyant Gas and Condensate Field
Revision as of 18:32, 20 February 2024 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: BP * Country: Trinidad And Tobago * Location: 35 miles southeast of Galeota * Production start: * Partners: * Type: Gas & Condensate * Estim...")
Summary Information
- Operator: BP
- Country: Trinidad And Tobago
- Location: 35 miles southeast of Galeota
- Production start:
- Partners:
- Type: Gas & Condensate
- Estimated Reserves:
- Production Volume:
+++ Description
- Flamboyant is located in about 230 feet of water, 35 miles southeast of Galeota
- Condensate is sent to the Galeota Point Oil Terminal
+++ Contractors
- -
+++ History
- 1993 - Flamboyant Gas And Condensate Field was discovered
- 1998 - The Interim Supply Gas Project was completed, increasing production
+++ Geology
+++ Links