Line 15: | Line 15: | ||
=== Contractors === | === Contractors === | ||
− | * Corinth Pipeworks: Manufacture and supply approximately 40km of 24” longitudinally submerged arc welded steel pipes | + | * '''Rosetti Marino:''' Construction of the platform |
+ | * '''Hereema:''' Installation of the platform | ||
+ | * '''Corinth Pipeworks:''' Manufacture and supply approximately 40km of 24” longitudinally submerged arc welded steel pipes | ||
=== History === | === History === | ||
* 2022 - Final investment decision | * 2022 - Final investment decision | ||
+ | * 2024 - Fenix platform installed | ||
=== Geology === | === Geology === | ||
Line 26: | Line 29: | ||
# [https://abarrelfull.blogspot.com/2023/03/argentina-launch-of-fenix-offshore-gas.html Argentina: Launch of the Fenix Offshore Gas Project] | # [https://abarrelfull.blogspot.com/2023/03/argentina-launch-of-fenix-offshore-gas.html Argentina: Launch of the Fenix Offshore Gas Project] | ||
# [https://abarrelfull.blogspot.com/2023/03/corinth-pipeworks-is-awarded-fenix.html Corinth Pipeworks is awarded Fenix offshore gas field in Argentina by TotalEnergies] | # [https://abarrelfull.blogspot.com/2023/03/corinth-pipeworks-is-awarded-fenix.html Corinth Pipeworks is awarded Fenix offshore gas field in Argentina by TotalEnergies] | ||
+ | # [https://a-barrel-full.blogspot.com/2024/03/successful-installation-of-fenix.html Successful installation of Fénix Platform off the coast of Argentina] | ||
Latest revision as of 16:47, 26 March 2024
Summary Information
- Operator: TotalEnergies
- Country: Argentina
- Location: Offshore Southern Argentina
- Production start: expected 2025
- Partners: TotalEnergies 37.5%, WintershallDea (37.5%) and Pan American Sur (25%).
- Type: Gas
- Estimated Reserves:
- Production Volume:
Description
- The Fenix field will be developed through three horizontal wells, drilled from a new unmanned platform in 70 meters water depth. The gas will be transported through a 35km pipeline to the TotalEnergies-operated Véga Pleyade platform and treated onshore at the Rio Cullen and Cañadon Alfa plants, also operated by the Company.
- At production start-up, expected early 2025, Fenix will produce10 million cubic meters per day of natural gas (70,000 barrels of oil equivalent per day). This development represents an investment of approximately $706 million.
- Fenix gas field is part of the Cuenca Marina Austral (CMA-1) license
Contractors
- Rosetti Marino: Construction of the platform
- Hereema: Installation of the platform
- Corinth Pipeworks: Manufacture and supply approximately 40km of 24” longitudinally submerged arc welded steel pipes
History
- 2022 - Final investment decision
- 2024 - Fenix platform installed