Difference between revisions of "Exxon Singapore Refinery"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information Ownership: Exxon Website: http://www.exxonmobil.com List of Exxon Mobil Refineries Location: Jurong Island, Singapore Capacity: 30 million tons/annum & 605...") |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
− | Ownership: Exxon | + | |
− | Website: http://www.exxonmobil.com | + | * Ownership: Exxon |
− | List of Exxon Mobil Refineries | + | * Website: http://www.exxonmobil.com |
− | Location: Jurong Island, Singapore | + | * List of [[[Exxon Mobil Refineries]]] |
− | Capacity: 30 million tons/annum & 605,000 bbl/day | + | * Location: Jurong Island, Singapore |
− | Nelson Complexity: | + | * Capacity: 30 million tons/annum & 605,000 bbl/day |
− | Refining Depth: | + | * Nelson Complexity: |
− | Brief Description | + | * Refining Depth: |
− | ExxonMobil's Singapore Refinery has two operating sites - one on the mainland and another on Jurong Island. The integrated refinery manufactures a wide range of fuels, lubes and specialty products. The Refinery also provides advantaged feedstock to the steam cracker and two aromatics plants that are located adjacent to the Refinery. | + | |
− | Refining Units | + | +++ Brief Description |
− | Atmospheric Distillation | + | * ExxonMobil's Singapore Refinery has two operating sites - one on the mainland and another on Jurong Island. The integrated refinery manufactures a wide range of fuels, lubes and specialty products. The Refinery also provides advantaged feedstock to the steam cracker and two aromatics plants that are located adjacent to the Refinery. |
− | Vacuum Distillation Unit | + | |
− | Hydrocracker -23,000 bpd | + | +++ Refining Units |
− | Continuous catalytic reformer | + | |
− | Visbreaker - 55,000 bpd | + | * [[[Atmospheric Distillation]]] |
− | Distillate Dewaxing Unit - 12,000 | + | * Vacuum Distillation Unit |
− | Hydrogen Unit - 27,900 (Nm3/Hr) | + | * Hydrocracker -23,000 bpd |
− | Asphalt Unit | + | * Continuous catalytic reformer |
− | Terminal Capacity | + | * Visbreaker - 55,000 bpd |
− | Crude Oil: | + | * Distillate Dewaxing Unit - 12,000 |
− | Refined Products: | + | * Hydrogen Unit - 27,900 (Nm3/Hr) |
− | Crude Supply | + | * Asphalt Unit |
− | Can handle a wide range of crudes | + | |
− | Products Produced | + | +++ Terminal Capacity |
− | LPG, Naphtha, Gasoline, Diesel, Jet Fuel, Fuel Oil | + | |
− | Ongoing Projects | + | * Crude Oil: |
− | In 2010, ExxonMobil announced its plans to build a diesel hydrotreater at its Singapore refinery, increasing the refinery’s production capacity of ultra low sulfur diesel fuel | + | * Refined Products: |
− | It will come on stream by 2014 | + | |
− | Other Information | + | +++ Crude Supply |
− | - | + | * Can handle a wide range of crudes |
− | History | + | |
− | 1965 - Jurong Refinery comes on stream | + | +++ Products Produced |
− | 1971 - Jurong Island (PAC) Refinery comes on stream | + | * LPG, Naphtha, Gasoline, Diesel, Jet Fuel, Fuel Oil |
− | 1973 - Capacity expanded with the addition of 157,000 bpd CDU (Chiyoda) | + | |
− | 1982 - Atmospheric distillation unit debottlenecked, visbreaker and Vacuum Distillation Unit added (Chiyoda) | + | +++ Ongoing Projects |
− | 1985 - Mobil revamps it CDU to allow the processing of far eastern crudes | + | * In 2010, ExxonMobil announced its plans to build a diesel hydrotreater at its Singapore refinery, increasing the refinery’s production capacity of ultra low sulfur diesel fuel |
− | 1990 - Hydrocracking unit, Hydrogen Unit and Distillate Dewaxing Unit commissioned (Chiyoda) | + | * It will come on stream by 2014 |
− | 1994 - Mobil completes its US$1.1 billion continuous catalytic reformer and aromatics unit | + | |
− | 1997 - Mobil completes US$250 million lubricant base oil plant. Refining capacity at Pioneer Road facility raised to 300,000 bpd | + | +++ Other Information |
− | 2014 - Light Oil Desulphurization Unit commissioned | + | * - |
− | + | ||
− | Chiyoda Crude Distillation Units | + | +++ History |
− | Chiyoda Distillate Dewaxing Units | + | * 1965 - Jurong Refinery comes on stream |
− | Chiyoda Sulfur Recovery Units | + | * 1971 - Jurong Island (PAC) Refinery comes on stream |
− | Chiyoda Naphtha And Middle Distillate Hydrodesulfurization U | + | * 1973 - Capacity expanded with the addition of 157,000 bpd CDU (Chiyoda) |
− | Chiyoda Hydrogen Manufacturing Units | + | * 1982 - Atmospheric distillation unit debottlenecked, visbreaker and Vacuum Distillation Unit added (Chiyoda) |
− | Chiyoda Sweetening Units | + | * 1985 - Mobil revamps it CDU to allow the processing of far eastern crudes |
− | Chiyoda H2S Removal Units With Amine | + | * 1990 - Hydrocracking unit, Hydrogen Unit and Distillate Dewaxing Unit commissioned (Chiyoda) |
− | Chiyoda Vacuum Flasher Vacuum Distillation Units | + | * 1994 - Mobil completes its US$1.1 billion continuous catalytic reformer and aromatics unit |
− | JGC Refinery References | + | * 1997 - Mobil completes US$250 million lubricant base oil plant. Refining capacity at Pioneer Road facility raised to 300,000 bpd |
− | Refinery Webpage | + | * 2014 - Light Oil Desulphurization Unit commissioned |
− | New Singapore diesel hydrotreater project to boost ultra low sulfur diesel supply | + | |
− | Exxon's Singapore visbreaker shut for repairs | + | |
− | Industrial Incident at Singapore Refinery | + | |
+ | === Links === | ||
+ | |||
+ | # [[[Chiyoda Crude Distillation Units]]] | ||
+ | # [[[Chiyoda Distillate Dewaxing Units]]] | ||
+ | # [[[Chiyoda Sulfur Recovery Units]]] | ||
+ | # [[[Chiyoda Naphtha And Middle Distillate Hydrodesulfurization U]]] | ||
+ | # [[[Chiyoda Hydrogen Manufacturing Units]]] | ||
+ | # [[[Chiyoda Sweetening Units]]] | ||
+ | # [[[Chiyoda H2S Removal Units With Amine]]] | ||
+ | # [[[Chiyoda Vacuum Flasher Vacuum Distillation Units]]] | ||
+ | # [[[JGC Refinery References]]] | ||
+ | # [http://www.exxonmobil.com/AP-English/about_who_profile_refinery.aspx Refinery Webpage] | ||
+ | # [http://www.exxonmobil.com/AP-English/news_releases_20101123.aspx New Singapore diesel hydrotreater project to boost ultra low sulfur diesel supply] | ||
+ | # [http://gulfnews.com/business/oil-gas/exxon-s-singapore-visbreaker-shut-for-repairs-1.444000 Exxon's Singapore visbreaker shut for repairs] | ||
+ | # [http://killajoules.wikidot.com/blog:687 Industrial Incident at Singapore Refinery] |
Revision as of 15:00, 11 September 2022
Summary Information
- Ownership: Exxon
- Website: http://www.exxonmobil.com
* List of [[[Exxon Mobil Refineries]]]
- Location: Jurong Island, Singapore
- Capacity: 30 million tons/annum & 605,000 bbl/day
- Nelson Complexity:
- Refining Depth:
+++ Brief Description
- ExxonMobil's Singapore Refinery has two operating sites - one on the mainland and another on Jurong Island. The integrated refinery manufactures a wide range of fuels, lubes and specialty products. The Refinery also provides advantaged feedstock to the steam cracker and two aromatics plants that are located adjacent to the Refinery.
+++ Refining Units
- [[[Atmospheric Distillation]]]
- Vacuum Distillation Unit
- Hydrocracker -23,000 bpd
- Continuous catalytic reformer
- Visbreaker - 55,000 bpd
- Distillate Dewaxing Unit - 12,000
- Hydrogen Unit - 27,900 (Nm3/Hr)
- Asphalt Unit
+++ Terminal Capacity
- Crude Oil:
- Refined Products:
+++ Crude Supply
- Can handle a wide range of crudes
+++ Products Produced
- LPG, Naphtha, Gasoline, Diesel, Jet Fuel, Fuel Oil
+++ Ongoing Projects
- In 2010, ExxonMobil announced its plans to build a diesel hydrotreater at its Singapore refinery, increasing the refinery’s production capacity of ultra low sulfur diesel fuel
- It will come on stream by 2014
+++ Other Information
- -
+++ History
- 1965 - Jurong Refinery comes on stream
- 1971 - Jurong Island (PAC) Refinery comes on stream
- 1973 - Capacity expanded with the addition of 157,000 bpd CDU (Chiyoda)
- 1982 - Atmospheric distillation unit debottlenecked, visbreaker and Vacuum Distillation Unit added (Chiyoda)
- 1985 - Mobil revamps it CDU to allow the processing of far eastern crudes
- 1990 - Hydrocracking unit, Hydrogen Unit and Distillate Dewaxing Unit commissioned (Chiyoda)
- 1994 - Mobil completes its US$1.1 billion continuous catalytic reformer and aromatics unit
- 1997 - Mobil completes US$250 million lubricant base oil plant. Refining capacity at Pioneer Road facility raised to 300,000 bpd
- 2014 - Light Oil Desulphurization Unit commissioned
Links
- [[[Chiyoda Crude Distillation Units]]]
- [[[Chiyoda Distillate Dewaxing Units]]]
- [[[Chiyoda Sulfur Recovery Units]]]
- [[[Chiyoda Naphtha And Middle Distillate Hydrodesulfurization U]]]
- [[[Chiyoda Hydrogen Manufacturing Units]]]
- [[[Chiyoda Sweetening Units]]]
- [[[Chiyoda H2S Removal Units With Amine]]]
- [[[Chiyoda Vacuum Flasher Vacuum Distillation Units]]]
- [[[JGC Refinery References]]]
- Refinery Webpage
- New Singapore diesel hydrotreater project to boost ultra low sulfur diesel supply
- Exxon's Singapore visbreaker shut for repairs
- Industrial Incident at Singapore Refinery