Difference between revisions of "Exxon Singapore Refinery"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information Ownership: Exxon Website: http://www.exxonmobil.com List of Exxon Mobil Refineries Location: Jurong Island, Singapore Capacity: 30 million tons/annum & 605...")
 
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
Ownership: Exxon
+
 
Website: http://www.exxonmobil.com
+
* Ownership: Exxon
List of Exxon Mobil Refineries
+
* Website: http://www.exxonmobil.com
Location: Jurong Island, Singapore
+
* List of [[[Exxon Mobil Refineries]]]
Capacity: 30 million tons/annum & 605,000 bbl/day
+
* Location: Jurong Island, Singapore
Nelson Complexity:
+
* Capacity: 30 million tons/annum & 605,000 bbl/day
Refining Depth:
+
* Nelson Complexity:  
Brief Description
+
* Refining Depth:
ExxonMobil's Singapore Refinery has two operating sites - one on the mainland and another on Jurong Island. The integrated refinery manufactures a wide range of fuels, lubes and specialty products. The Refinery also provides advantaged feedstock to the steam cracker and two aromatics plants that are located adjacent to the Refinery.
+
 
Refining Units
+
+++ Brief Description
Atmospheric Distillation
+
* ExxonMobil's Singapore Refinery has two operating sites - one on the mainland and another on Jurong Island. The integrated refinery manufactures a wide range of fuels, lubes and specialty products. The Refinery also provides advantaged feedstock to the steam cracker and two aromatics plants that are located adjacent to the Refinery.
Vacuum Distillation Unit
+
 
Hydrocracker -23,000 bpd
+
+++ Refining Units
Continuous catalytic reformer
+
 
Visbreaker - 55,000 bpd
+
* [[[Atmospheric Distillation]]]
Distillate Dewaxing Unit - 12,000
+
* Vacuum Distillation Unit
Hydrogen Unit - 27,900 (Nm3/Hr)
+
* Hydrocracker -23,000 bpd
Asphalt Unit
+
* Continuous catalytic reformer  
Terminal Capacity
+
* Visbreaker - 55,000 bpd
Crude Oil:
+
* Distillate Dewaxing Unit - 12,000
Refined Products:
+
* Hydrogen Unit - 27,900 (Nm3/Hr)
Crude Supply
+
* Asphalt Unit
Can handle a wide range of crudes
+
 
Products Produced
+
+++ Terminal Capacity
LPG, Naphtha, Gasoline, Diesel, Jet Fuel, Fuel Oil
+
 
Ongoing Projects
+
* Crude Oil:  
In 2010, ExxonMobil announced its plans to build a diesel hydrotreater at its Singapore refinery, increasing the refinery’s production capacity of ultra low sulfur diesel fuel
+
* Refined Products:  
It will come on stream by 2014
+
 
Other Information
+
+++ Crude Supply
-
+
* Can handle a wide range of crudes  
History
+
 
1965 - Jurong Refinery comes on stream
+
+++ Products Produced
1971 - Jurong Island (PAC) Refinery comes on stream
+
* LPG, Naphtha, Gasoline, Diesel, Jet Fuel, Fuel Oil
1973 - Capacity expanded with the addition of 157,000 bpd CDU (Chiyoda)
+
 
1982 - Atmospheric distillation unit debottlenecked, visbreaker and Vacuum Distillation Unit added (Chiyoda)
+
+++ Ongoing Projects
1985 - Mobil revamps it CDU to allow the processing of far eastern crudes
+
* In 2010, ExxonMobil announced its plans to build a diesel hydrotreater at its Singapore refinery, increasing the refinery’s production capacity of ultra low sulfur diesel fuel
1990 - Hydrocracking unit, Hydrogen Unit and Distillate Dewaxing Unit commissioned (Chiyoda)
+
* It will come on stream by 2014
1994 - Mobil completes its US$1.1 billion continuous catalytic reformer and aromatics unit
+
 
1997 - Mobil completes US$250 million lubricant base oil plant. Refining capacity at Pioneer Road facility raised to 300,000 bpd
+
+++ Other Information
2014 - Light Oil Desulphurization Unit commissioned
+
* -
Relevant Links
+
 
Chiyoda Crude Distillation Units
+
+++ History
Chiyoda Distillate Dewaxing Units
+
* 1965 - Jurong Refinery comes on stream
Chiyoda Sulfur Recovery Units
+
* 1971 - Jurong Island (PAC) Refinery comes on stream
Chiyoda Naphtha And Middle Distillate Hydrodesulfurization U
+
* 1973 - Capacity expanded with the addition of 157,000 bpd CDU (Chiyoda)
Chiyoda Hydrogen Manufacturing Units
+
* 1982 - Atmospheric distillation unit debottlenecked, visbreaker and Vacuum Distillation Unit added (Chiyoda)
Chiyoda Sweetening Units
+
* 1985 - Mobil revamps it CDU to allow the processing of far eastern crudes
Chiyoda H2S Removal Units With Amine
+
* 1990 - Hydrocracking unit, Hydrogen Unit and Distillate Dewaxing Unit commissioned (Chiyoda)
Chiyoda Vacuum Flasher Vacuum Distillation Units
+
* 1994 - Mobil completes its US$1.1 billion continuous catalytic reformer and aromatics unit
JGC Refinery References
+
* 1997 - Mobil completes US$250 million lubricant base oil plant. Refining capacity at Pioneer Road facility raised to 300,000 bpd
Refinery Webpage
+
* 2014 - Light Oil Desulphurization Unit commissioned
New Singapore diesel hydrotreater project to boost ultra low sulfur diesel supply
+
 
Exxon's Singapore visbreaker shut for repairs
+
 
Industrial Incident at Singapore Refinery
+
 
 +
=== Links ===
 +
 
 +
# [[[Chiyoda Crude Distillation Units]]]
 +
# [[[Chiyoda Distillate Dewaxing Units]]]
 +
# [[[Chiyoda Sulfur Recovery Units]]]
 +
# [[[Chiyoda Naphtha And Middle Distillate Hydrodesulfurization U]]]
 +
# [[[Chiyoda Hydrogen Manufacturing Units]]]
 +
# [[[Chiyoda Sweetening Units]]]
 +
# [[[Chiyoda H2S Removal Units With Amine]]]
 +
# [[[Chiyoda Vacuum Flasher Vacuum Distillation Units]]]
 +
# [[[JGC Refinery References]]]
 +
# [http://www.exxonmobil.com/AP-English/about_who_profile_refinery.aspx Refinery Webpage]
 +
# [http://www.exxonmobil.com/AP-English/news_releases_20101123.aspx New Singapore diesel hydrotreater project to boost ultra low sulfur diesel supply]
 +
# [http://gulfnews.com/business/oil-gas/exxon-s-singapore-visbreaker-shut-for-repairs-1.444000 Exxon's Singapore visbreaker shut for repairs]
 +
# [http://killajoules.wikidot.com/blog:687 Industrial Incident at Singapore Refinery]

Revision as of 15:00, 11 September 2022

Summary Information

* List of [[[Exxon Mobil Refineries]]]
  • Location: Jurong Island, Singapore
  • Capacity: 30 million tons/annum & 605,000 bbl/day
  • Nelson Complexity:
  • Refining Depth:

+++ Brief Description

  • ExxonMobil's Singapore Refinery has two operating sites - one on the mainland and another on Jurong Island. The integrated refinery manufactures a wide range of fuels, lubes and specialty products. The Refinery also provides advantaged feedstock to the steam cracker and two aromatics plants that are located adjacent to the Refinery.

+++ Refining Units

  • [[[Atmospheric Distillation]]]
  • Vacuum Distillation Unit
  • Hydrocracker -23,000 bpd
  • Continuous catalytic reformer
  • Visbreaker - 55,000 bpd
  • Distillate Dewaxing Unit - 12,000
  • Hydrogen Unit - 27,900 (Nm3/Hr)
  • Asphalt Unit

+++ Terminal Capacity

  • Crude Oil:
  • Refined Products:

+++ Crude Supply

  • Can handle a wide range of crudes

+++ Products Produced

  • LPG, Naphtha, Gasoline, Diesel, Jet Fuel, Fuel Oil

+++ Ongoing Projects

  • In 2010, ExxonMobil announced its plans to build a diesel hydrotreater at its Singapore refinery, increasing the refinery’s production capacity of ultra low sulfur diesel fuel
  • It will come on stream by 2014

+++ Other Information

  • -

+++ History

  • 1965 - Jurong Refinery comes on stream
  • 1971 - Jurong Island (PAC) Refinery comes on stream
  • 1973 - Capacity expanded with the addition of 157,000 bpd CDU (Chiyoda)
  • 1982 - Atmospheric distillation unit debottlenecked, visbreaker and Vacuum Distillation Unit added (Chiyoda)
  • 1985 - Mobil revamps it CDU to allow the processing of far eastern crudes
  • 1990 - Hydrocracking unit, Hydrogen Unit and Distillate Dewaxing Unit commissioned (Chiyoda)
  • 1994 - Mobil completes its US$1.1 billion continuous catalytic reformer and aromatics unit
  • 1997 - Mobil completes US$250 million lubricant base oil plant. Refining capacity at Pioneer Road facility raised to 300,000 bpd
  • 2014 - Light Oil Desulphurization Unit commissioned


Links

  1. [[[Chiyoda Crude Distillation Units]]]
  2. [[[Chiyoda Distillate Dewaxing Units]]]
  3. [[[Chiyoda Sulfur Recovery Units]]]
  4. [[[Chiyoda Naphtha And Middle Distillate Hydrodesulfurization U]]]
  5. [[[Chiyoda Hydrogen Manufacturing Units]]]
  6. [[[Chiyoda Sweetening Units]]]
  7. [[[Chiyoda H2S Removal Units With Amine]]]
  8. [[[Chiyoda Vacuum Flasher Vacuum Distillation Units]]]
  9. [[[JGC Refinery References]]]
  10. Refinery Webpage
  11. New Singapore diesel hydrotreater project to boost ultra low sulfur diesel supply
  12. Exxon's Singapore visbreaker shut for repairs
  13. Industrial Incident at Singapore Refinery