Europipe I Gas Pipeline
Jump to navigation
Jump to search
Summary Information
- Source: Draupner E riser platform
- Destination: Dornum, Germany
- Ownership: Gassco
- Website: www.gassco.no
- Length: kilometres ( miles)
- Capacity: 46 MSm3 per day
- Status: Operating
+++ Details
- The Europipe I gas pipeline runs from the Draupner E riser platform in the North Sea to a receiving terminal at Dornum on the German coast. With an internal diameter of 40 inches, it is 620 kilometres long.
- Gas is supplied from the Kollsnes Gas Processing Plant
+++ Contractors
- **Saipem:** Europipe 16/11E Riser Platform T&I
- **Kvaerner:** 16/11-E Jacket
- **Global Maritime:** Project specific hazard analyses
+++ History
- 1995 - Europipe I became operational
+++ Other Information
- -
+++ Links