Espirito Santo BC-10 FPSO

From A Barrel Full
Jump to navigation Jump to search

Summary Information

+++ Brief Description

  • FPSO Espirito Santo has a daily processing capacity of 100,000 barrels of oil and 1.42 million cubic meters of gas, and storage of up to 1.4 million barrels.
  • It is the conversion of a crude tanker

+++ Contractors

  • **SBM Offshore:** Lease and operation of the FPSO
  • **Keppel :** Conversion, including refurbishment and conversion of the vessel’s existing systems, upgrading of the accommodation facilities, fabrication and installation of sponson tanks (making the entire hull double sided), the turret mooring system, pipe rack, flare tower and helideck as well as integration of all of the oil processing modules
  • **Kavin Engineering:** Gas Dehydration and TEG Regeneration Package
  • **Nexans:** Manufacture and supply the specialized offshore power, control and instrumentation cables
  • **Dyna-Mac:** Seven units of topside modules
  • **VWS Westgarth:** Water Treatment

+++ Status

  • In operation

+++ History

  • 2006 - SBM Offshore awarded FPSO contract
  • 2008 - Espirito Santo FPSO arrives in Brazil
  • 2009 - Phase 1 oil production starts

+++ Other Information

  • -

+++ Links

  1. Dyna-Mac Topsides Module Business
  2. International Protective Coatings FPSO References
  3. Kavin Engineering FPSO References
  4. Misc FPSOs And Platforms
  5. VWS Westgarth FPSO References
  6. Nexans completes an offshore cable contract for the conversion of ESPIRITO SANTO FPSO
  7. Keppel Shipyard scores another safety record with its ninth FPSO delivery for SBM
  8. Parque das Conchas FPSO arrives in Brazil
  9. New Orders For SBM Offshore Including A Lease Contract With Shell For The BC-10 FPSO, Brazil
  10. Shell begins production at Parque das Conchas (BC-10) offshore Brazil