Erawan Gas Field

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Operator: Chevron
  • Country: Thailand
  • Location: Gulf of Thailand
  • Production start:
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

+++ Description

  • The first commercial natural gas field in the Gulf of Thailand, the field utilises an FSO
  • There are three production platforms , Erawan BWA, EWG & SWA and a Mercury Removal Platform (ERMRP)

+++ Contractors

  • **Sofec:** External Turret for FSO Erawan
  • **Bluewater:**
    • CALRAM Buoy for FSO Erawan
    • Calm Buoy system for FSO Erawan
  • **Micoperi:** Installation of subsea pipelines
  • **Saipem:** Riser platform
  • **Cuel:** Mercury Removal Platform (ERMRP)
  • **FoundOcean:** Grouting for platforms

+++ History

  • 1981 - Erawan Gas Field began production

+++ Geology

+++ Links

  1. [1]
  2. Sofec FPSO References
  3. Micoperi Offshore Pipeline References
  4. Bluewater Mooring References
  5. FoundOcean Subsea References
  6. Saipem Asia Pipeline References
  7. Cuel Platform References