Summary Information
 
Summary Information
* Operator: Hess
+
* Operator: Western Gas
 
* Country: Australia  
 
* Country: Australia  
* Location:  
+
* Location: northwest coast of Australi
* Production start:  
+
* Production start: Expected 2024
 
* Partners:  
 
* Partners:  
 
* Type: Gas and Condensate
 
* Type: Gas and Condensate
Line 11: Line 11:
 
+++ Description
 
+++ Description
 
* The permits cover over 1 million acres and are located approximately 115 miles off the northwest coast of Australia in water depths of approximately 3,600 feet
 
* The permits cover over 1 million acres and are located approximately 115 miles off the northwest coast of Australia in water depths of approximately 3,600 feet
 +
* The Equus Gas Project Basis of Design comprises an offshore processing facility and a pipeline to shore, with landfall near Onslow.
 +
* Development will be phased, with the initial development comprising three production wells linked by subsea infrastructure to a Floating Production Storage and Offloading (FPSO) unit. Facilities on-board the FPSO will include gas dehydration, condensate stripping and gas compression. Water depth at the well locations is 1000m to 1200m.
 +
* Dry sales gas will be piped to shore by way of a 220km pipeline, with onshore facilities dependent on the outcome of gas marketing arrangements. Gas supply is expected to be up to 250 terajoules of gas a day.
 
* Gas is to be supplied to [[North West Shelf LNG]]
 
* Gas is to be supplied to [[North West Shelf LNG]]
  
Line 21: Line 24:
 
* 2012 - Subsea and platform FEED awarded
 
* 2012 - Subsea and platform FEED awarded
 
* 2014 - LOI signed for liquefaction contract with NWS
 
* 2014 - LOI signed for liquefaction contract with NWS
 +
* 2017 - Wesetern Gas acquired the project from Hess
  
 
+++ Geology
 
+++ Geology

Revision as of 07:32, 27 November 2023

Summary Information

  • Operator: Western Gas
  • Country: Australia
  • Location: northwest coast of Australi
  • Production start: Expected 2024
  • Partners:
  • Type: Gas and Condensate
  • Estimated Reserves:
  • Production Volume:

+++ Description

  • The permits cover over 1 million acres and are located approximately 115 miles off the northwest coast of Australia in water depths of approximately 3,600 feet
  • The Equus Gas Project Basis of Design comprises an offshore processing facility and a pipeline to shore, with landfall near Onslow.
  • Development will be phased, with the initial development comprising three production wells linked by subsea infrastructure to a Floating Production Storage and Offloading (FPSO) unit. Facilities on-board the FPSO will include gas dehydration, condensate stripping and gas compression. Water depth at the well locations is 1000m to 1200m.
  • Dry sales gas will be piped to shore by way of a 220km pipeline, with onshore facilities dependent on the outcome of gas marketing arrangements. Gas supply is expected to be up to 250 terajoules of gas a day.
  • Gas is to be supplied to North West Shelf LNG

+++ Contractors

  • **Aker Solutions:** Conceptual Study
  • **Wood Group Kenny:** Subsea and pipelines FEED contract
  • **INTECSEA / WorleyParsons:** Topsides and floating system FEED engineering

+++ History

  • 2012 - Subsea and platform FEED awarded
  • 2014 - LOI signed for liquefaction contract with NWS
  • 2017 - Wesetern Gas acquired the project from Hess

+++ Geology

+++ Links

  1. Aker Solutions Hydrate Inhibition References
  2. INTECSEA Announces Award of Hess Equus Project in Western Australia
  3. Hess awards Wood Group Kenny FEED contract for Equus project
  4. Hess Announces LOI with the North West Shelf to Liquefy Equus Gas