Difference between revisions of "Enterprise Aegis Ethane Pipeline"

From A Barrel Full
Jump to navigation Jump to search
Line 13: Line 13:
 
* The Aegis Ethane pipeline is a 270-mile pipeline system that consists of three sections:
 
* The Aegis Ethane pipeline is a 270-mile pipeline system that consists of three sections:
 
** Section one is a 60-mile pipeline system designed to transport purity ethane from Enterprise’s Mont Belvieu, Texas liquids storage complex to Beaumont, Texas
 
** Section one is a 60-mile pipeline system designed to transport purity ethane from Enterprise’s Mont Belvieu, Texas liquids storage complex to Beaumont, Texas
** Section 2 connects Beaumont to Lake Charles, Louisiana
+
** Section 2 connects Beaumont to Lake Charles, Louisiana and is 48 miles
** Section 3 connects the pipeline to the Mississippi River
+
** Section 3 connects the pipeline to Napoleonville, Louisiana and is 162 miles
 
** It supplies petrochemical facilities in Texas and Louisiana.  
 
** It supplies petrochemical facilities in Texas and Louisiana.  
 
* The pipeline is 20 inches
 
* The pipeline is 20 inches
  
 
+++ Pipeline Status
 
+++ Pipeline Status
* Section 1 & 2 are in operation
+
* All sections are in operation
  
 
+++ History
 
+++ History

Revision as of 16:06, 25 September 2023

Summary Information

  • Source: Mont Belvieu, Texas
  • Destination: Mississippi River, Louisiana
  • Ownership: Enterprise
  • Website: http://www.enterpriseproducts.com/
  • Length: kilometres (270 miles)
  • Capacity: 425,000 barrels per day of ethane
  • Product Type: Ethane

+++ Brief Description

  • The Aegis Ethane pipeline is a 270-mile pipeline system that consists of three sections:
    • Section one is a 60-mile pipeline system designed to transport purity ethane from Enterprise’s Mont Belvieu, Texas liquids storage complex to Beaumont, Texas
    • Section 2 connects Beaumont to Lake Charles, Louisiana and is 48 miles
    • Section 3 connects the pipeline to Napoleonville, Louisiana and is 162 miles
    • It supplies petrochemical facilities in Texas and Louisiana.
  • The pipeline is 20 inches

+++ Pipeline Status

  • All sections are in operation

+++ History

  • 2013 - Enterprise launches the project
  • 2014 - The first stage of the pipeline is completed
  • 2015 - Open season for expansion
  • 2015 - Second stage completed
  • 2015 - Open season for expansion

+++ Other Information

  • -

+++ Links

  1. EIA Liquids Pipeline Projects 2015-2020
  2. Enterprise Announces Gulf Coast Ethane Pipeline
  3. Enterprise Offering Additional Capacity on Aegis Ethane Pipeline System
  4. Enterprise to Increase Capacity on Aegis Ethane Pipeline; Conducts Supplemental Open Season
  5. Enterprise Completes Initial Segment of Aegis Ethane Pipeline
  6. Enterprise Offering Additional Capacity on Aegis Ethane Pipeline System
  7. Enterprise Signs Additional Commitment for Aegis Ethane Pipeline
  8. Enterprise Completes Second Segment of Aegis Ethane Pipeline
  9. Enterprise Offering Additional Capacity on Aegis Ethane Pipeline System
  10. Enterprise Completes Final Segment of Aegis Pipeline