Difference between revisions of "Ennore LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 8: | Line 8: | ||
=== Brief Description === | === Brief Description === | ||
− | + | * A 5 mtpa onshore regasification plant | |
=== Technical Details === | === Technical Details === |
Latest revision as of 18:27, 26 June 2022
Contents
Summary Information
- Ownership: Indian Oil Company IOCL
- Website: https://www.indianoillng.com/
- Location: Ennore
- Capacity: 5.0 million tons/annum
- Status: In operation
Brief Description
- A 5 mtpa onshore regasification plant
Technical Details
- Storage capacity:
- Unloading capacity:
- Send out capacity:
- Constructor:
Ongoing Projects/Project Status
Suppliers / Customers
- Suppliers:
- Customers: The re-gasified LNG is distributed to power generation plants, fertilizer plants and other industrial units
- The pipeline from Ennore terminal passes through Manali—Thiruvallur—Puducherry—Nagapattinam—Madurai—Trichy—Tuticorin—Ramnathpuram and a separate line to Bengaluru via Hosur
History
- 2015 - Black & Veatch consortium wins EPC contract
- 2019 - The terminal began commercial operations
Other Information
-