Difference between revisions of "Ennore LNG Terminal"

From A Barrel Full
Jump to navigation Jump to search
 
(2 intermediate revisions by the same user not shown)
Line 8: Line 8:
  
 
=== Brief Description ===
 
=== Brief Description ===
 
+
* A 5 mtpa onshore regasification plant
  
 
=== Technical Details ===
 
=== Technical Details ===
Line 24: Line 24:
 
* Suppliers:
 
* Suppliers:
 
* Customers: The re-gasified LNG is distributed to power generation plants, fertilizer plants and other industrial units
 
* Customers: The re-gasified LNG is distributed to power generation plants, fertilizer plants and other industrial units
 +
* The pipeline from Ennore terminal passes through Manali—Thiruvallur—Puducherry—Nagapattinam—Madurai—Trichy—Tuticorin—Ramnathpuram and a separate line to Bengaluru via Hosur
  
 
=== History ===
 
=== History ===
Line 35: Line 36:
 
=== Links ===
 
=== Links ===
 
# [https://abarrelfull.blogspot.com/2022/06/black-veatch-consortium-wins-epc.html Black & Veatch consortium wins EPC contract for India’s first east coast LNG terminal]
 
# [https://abarrelfull.blogspot.com/2022/06/black-veatch-consortium-wins-epc.html Black & Veatch consortium wins EPC contract for India’s first east coast LNG terminal]
 +
# [https://abarrelfull.blogspot.com/2022/06/prime-minister-of-india-dedicates.html Prime Minister of India dedicates IndianOil’s Ennore LNG Terminal to the nation]
  
 
[[category:LNG]]
 
[[category:LNG]]
 
[[category:country]]
 
[[category:country]]
 
[[category:company]]
 
[[category:company]]

Latest revision as of 18:27, 26 June 2022

Summary Information

Brief Description

  • A 5 mtpa onshore regasification plant

Technical Details

  • Storage capacity:
  • Unloading capacity:
  • Send out capacity:
  • Constructor:

Ongoing Projects/Project Status

Suppliers / Customers

  • Suppliers:
  • Customers: The re-gasified LNG is distributed to power generation plants, fertilizer plants and other industrial units
  • The pipeline from Ennore terminal passes through Manali—Thiruvallur—Puducherry—Nagapattinam—Madurai—Trichy—Tuticorin—Ramnathpuram and a separate line to Bengaluru via Hosur

History

  • 2015 - Black & Veatch consortium wins EPC contract
  • 2019 - The terminal began commercial operations

Other Information

-

Links

  1. Black & Veatch consortium wins EPC contract for India’s first east coast LNG terminal
  2. Prime Minister of India dedicates IndianOil’s Ennore LNG Terminal to the nation