Difference between revisions of "Energia Costa Azul LNG Export Terminal"

From A Barrel Full
Jump to navigation Jump to search
Line 35: Line 35:
 
# [[LNG Terminals Using Air Products Technology]]
 
# [[LNG Terminals Using Air Products Technology]]
 
# [https://abarrelfull.blogspot.com/2021/12/sempra-energy-units-sign-three-heads-of.html Sempra Energy Units Sign Three Heads Of Agreements With Total S.A., Mitsui & Co., Tokyo Gas Co. For Energía Costa Azul Liquefaction Project ]
 
# [https://abarrelfull.blogspot.com/2021/12/sempra-energy-units-sign-three-heads-of.html Sempra Energy Units Sign Three Heads Of Agreements With Total S.A., Mitsui & Co., Tokyo Gas Co. For Energía Costa Azul Liquefaction Project ]
 +
# [https://abarrelfull.blogspot.com/2021/12/energia-costa-azul-lng-receives-us-non.html Energía Costa Azul LNG Receives US Non-FTA Approval For Liquefaction-Export Infrastructure Project In Mexico]
 
# [https://abarrelfull.blogspot.com/2021/12/air-products-lng-technology-selected.html Air Products’ LNG Technology Selected for Energia Costa Azul Export Project in Mexico]
 
# [https://abarrelfull.blogspot.com/2021/12/air-products-lng-technology-selected.html Air Products’ LNG Technology Selected for Energia Costa Azul Export Project in Mexico]
 
# [https://abarrelfull.blogspot.com/2021/12/sempra-energy-announces-fid-for.html Sempra Energy Announces FID For Landmark Energía Costa Azul LNG Export Project]
 
# [https://abarrelfull.blogspot.com/2021/12/sempra-energy-announces-fid-for.html Sempra Energy Announces FID For Landmark Energía Costa Azul LNG Export Project]
 
# [https://abarrelfull.blogspot.com/2021/12/technipfmc-receives-notice-to-proceed_15.html TechnipFMC Receives Notice to Proceed for EPC Contract for Sempra LNG’s and IEnova’s Energía Costa Azul LNG Facility]
 
# [https://abarrelfull.blogspot.com/2021/12/technipfmc-receives-notice-to-proceed_15.html TechnipFMC Receives Notice to Proceed for EPC Contract for Sempra LNG’s and IEnova’s Energía Costa Azul LNG Facility]

Revision as of 08:53, 16 December 2021

Summary Information

  • Ownership: Sempra
  • Website: https://www.ecalng.com/
  • Location: Baja California
  • Capacity: 3.5 million tons/annum
  • Status: Under Construction

Brief Description

  • The project will convert Costa Azul LNG into a liquefaction terminal
  • ECA LNG Phase 1 will be built as a single-train liquefaction facility with a nameplate capacity of 3.25 million tonnes per annum (Mtpa) of LNG
  • Further expansion phases are planned

Technical Details

  • Storage capacity:
  • Constructor:
    • TechnipFMC - FEED and Engineering, Procurement, and Construction (EPC)
  • Licensor: Air Products

Ongoing Projects/Project Status

  • Commissioning is expected in 2024

Suppliers / Customers

  • Suppliers:
  • Customers: Total, Mitsui and Tokyo Gas will buy 0.8mtpa each

History

  • 2018 - Offtake agreements signed with Total, Mitsui and Tokyo Gas
  • 2020 - Project achieved FID

Other Information

  • -

Links

  1. LNG Terminals Using Air Products Technology
  2. Sempra Energy Units Sign Three Heads Of Agreements With Total S.A., Mitsui & Co., Tokyo Gas Co. For Energía Costa Azul Liquefaction Project
  3. Energía Costa Azul LNG Receives US Non-FTA Approval For Liquefaction-Export Infrastructure Project In Mexico
  4. Air Products’ LNG Technology Selected for Energia Costa Azul Export Project in Mexico
  5. Sempra Energy Announces FID For Landmark Energía Costa Azul LNG Export Project
  6. TechnipFMC Receives Notice to Proceed for EPC Contract for Sempra LNG’s and IEnova’s Energía Costa Azul LNG Facility