Enchilada Oil and Gas Field
Jump to navigation
Jump to search
Summary Information
- Operator: Shell
- Country: USA
- Location: Garden Banks Blocks 83, 84, 127, 128 and 172, Gulf of Mexico
- Production start: 1997
- Partners: Hess
- Type: Oil & Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- In the Enchilada Field there are two platforms, A platform on Garden Banks Blocks 83, 84, 127 and 128, and the B platform on Garden Banks Block 172
- Gas from the [[[Salsa Oil And Gas Field]]] is processed on the Enchilada Platform
- Natural gas is transported on the [[[Garden Banks Gas Pipeline]]]
+++ Contractors
- **Alliance Engineering:** Platform design & engineering
- **Gulf Island Fabrication:** Platform fabrication
- **Heerema Marine Contractors:** Enchilada 'A' Compliant Jacket installation
+++ History
- 1997 - Production from the A platform began
- 1998 - Production began from the B platform
+++ Geology
+++ Links
- Hess, 1998 Annual Report
- [[[Fiberbond Offshore Platform References]]]
- [[[FoundOcean North And South America Subsea References]]]